Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2018 BPU
>
03-29-18
>
03-29-2018 BPU RPT 06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2019 12:53:35 PM
Creation date
8/1/2019 10:12:16 AM
Metadata
Fields
Template:
General
Document Relationships
03-29-2018 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2018 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
RIVERSIDE PUBLIC UTILITIES <br /> Board Memorandum <br />BOARD OF PUBLIC UTILITIESDATE: MARCH 29, 2018 <br />ITEM NO: 6 <br />SUBJECT:PLAZA SUBSTATION4kV TO12kV CONVERSION OF CIRCUIT 443(PHASE 1)– <br />APPROVE WORK ORDER NO. 1808451 FOR $415,000 <br />ISSUE: <br />Approve Work Order No. 1808451 for the Plaza Substation4kV to 12kV conversion of Circuit 443 <br />(Phase 1), in the amount of $415,000. <br />RECOMMENDATION: <br />That the Board of Public UtilitiesapproveWork Order No. 1808451 for the Plaza Substation 4kV to 12kV <br />conversion of Circuit 443(Phase 1)in the amount of $415,000. <br />BACKGROUND: <br />On July 10, 2017, the Board of Public Utilities (Board) received the Planned Routine Electric and Water <br />Capital Projects Over $500,000 in fiscal year2017/18 report. The report provides an overview of the <br />routineinfrastructure projects and highlights the importance of these capital improvement projects. <br />Discussion of these projects was intended to provide context and familiarity to streamline Board approval <br />of individual project actions throughout the fiscal year. <br />One of the projects discussed was the planned voltage conversion of all remaining 4kV to 12kV <br />distribution circuits to improve system capacity and reliability as recommended in the Electric System <br />Master Plan (ESMP). This project is an important step in facilitatingfuture voltage conversionsby <br />creating additionalelectrical field ties to existing 12kV circuits in the surrounding area, as well as createa <br />new circuit tie back feed to Circuit 1355 from the Casa Blanca Substationwhich serves the Riverside <br />Medical Clinic. Intermittent electric service disruptions will be coordinated during construction and <br />advanced outage notifications will be issued to minimize the impact to customers. <br />Page 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.