Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2019 BPU
>
07-22-19
>
07-22-2019 BPU RPT 07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 9:04:31 AM
Creation date
7/23/2019 4:16:14 PM
Metadata
Fields
Template:
General
Document Relationships
07-22-2019 BPU AGENDA
(Cover Page)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2019 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
PJ A r F R F N F R c v L I F E <br />RIVERSIDE PUBLIC UTILITIES <br />W& Board Memorandum <br />P U B L I C U T I L I T I E S <br />BOARD OF PUBLIC UTILITIES DATE: JULY 22, 2019 <br />ITEM NO: <br />SUBJECT: BID NO. RPU -7654 FOR VAN BUREN 2 WELL REHABILITATION PROJECT WITH <br />BEST DRILLING AND PUMP, INC. IN THE AMOUNT OF $78,635; APPROVE WORK <br />ORDER NO. 1919780 IN THE AMOUNT OF $94,363 <br />ISSUES: <br />Award Bid No RPU -7654 for the rehabilitation of Van Buren 2 Well to Best Drilling and Pump, Inc., of <br />Colton, California, in the amount of $78,635 and approve Work Order No. 1919780 for a total project <br />expenditure in the amount of 94,363. <br />RECOMMENDATIONS: <br />That the Board of Public Utilities: <br />1. Award Bid No. RPU -7654 for the rehabilitation of Van Buren 2 Well to Best Drilling and Pump, Inc., <br />of Colton, California, in the amount of $78,635; and <br />2. Approve Work Order No. 1919780 for a total project expenditure in the amount of 94,363, which <br />includes the rehabilitation of Van Buren 2 Well, staff support, and contingency costs. <br />BACKGROUND: <br />The Van Buren 2 well is a potable water well in the vicinity of Grand Terrace that produces about two (2) <br />million gallons of water each day. Water levels in this area have been dropping over the last 10 years, <br />leading to a general decline in the well's water production. Furthermore, the well is producing a small <br />amount of sand and gravel, which can lead to premature wear and tear to the pumping equipment of the <br />wells. <br />Downhole videos identified that both the pump column, which carries water from the pump to the surface, <br />and the well casing had damage. <br />DISCUSSION: <br />BID No. RPU -7654 for the rehabilitation of Van Buren 2 Well was posted on April 24, 2019. This project <br />scope includes performing maintenance work on and making repairs to the well casing; repairing the pump <br />column; installing a new pump that is fine-tuned to the lower groundwater levels; and, testing the <br />rehabilitated well. <br />Bids were opened on May 24, 2019. Five (5) bids were received. Staff evaluated the bids and deemed <br />Best Drilling and Pump, Inc. to be the lowest responsive and responsible bidder. The bids received for the <br />
The URL can be used to link to this page
Your browser does not support the video tag.