Laserfiche WebLink
W A I R h N h B L Y I. l F F <br />PUBLIC UTILITIES <br />BOARD OF PUBLIC UTILITIES <br />RIVERSIDE PUBLIC UTILITIES <br />Board Memorandum <br />DATE: JULY 10, 2017 <br />ITEM NO: 9 <br />SUBJECT: CONSTRUCTION OF THE INDIANA AVENUE AND MARY STREET WATER <br />DISTRIBUTION MAIN REPLACEMENT PROJECT — 3,485 FEET OF NEW POTABLE <br />WATER PIPELINE — AWARD OF BID NO. RPU -7494 TO C.P. CONSTRUCTION CO., <br />INC. OF ONTARIO, CALIFORNIA, IN THE AMOUNT OF $1,284,968 — APPROVE <br />WORK ORDER NO. 1422097 FOR $2,017,000 <br />ISSUES: <br />Award Bid No. RPU -7494 to C.P. Construction Co., Inc. of Ontario, California, for the construction of the <br />Indiana Avenue and Mary Street Water Distribution Main Replacement Project in the amount of <br />$1,284,968; and approve the expenditure of $2,017,000 for Work Order No. 1422097. <br />RECOMMENDATIONS: <br />That the Board of Public Utilities: <br />1. Award a contract for the construction of the Indiana Avenue and Mary Street Water Distribution <br />Main Replacement Project — Bid No. RPU -7494 to the lowest responsive and responsible bidder, <br />C.P. Construction Co., Inc. of Ontario, California, in the amount of $1,284,968; and <br />2. Approve the capital expenditure of $2,017,000 for Work Order No. 1422097, which includes all <br />design, construction, paving, contract administration, inspection and construction contingency <br />costs for the Indiana Avenue and Mary Street Water Distribution Main Replacement Project. <br />BACKGROUND: <br />The construction of the Indiana Avenue and Mary Street Water Distribution Main Replacement Project is <br />part of RPU's ongoing water main replacement program to replace old and high priority leaky mains. <br />The project area consists of existing 4 -inch cast iron pipeline and 4 -inch asbestos cement pipeline <br />installed in the 1940's. Based on their leak history, age and size, these water pipelines are high priorities <br />for replacement to enhance system reliability and increase fire flow. This project will increase the <br />capacity of the existing distribution pipelines to eliminate their dependence on a parallel transmission <br />pipeline to achieve the required fire flow. <br />This project is in line with Riverside Public Utilities' (RPU) infrastructure road map and Utility 2.0 and <br />directly benefits RPU water customers within the vicinity of the project in terms of system reliability and <br />improved fire protection. This project consists of approximately 0.7 miles of replacement water main, <br />representing about 27% of RPU's goal for water main replacements during fiscal year 2017/18. The <br />following table summarizes the water main replacement projects that have been approved for fiscal year <br />2017/18: <br />