Laserfiche WebLink
WATER I ENERGY I LIF E <br />RIVERSIDE PUBLIC UTILITIES <br />CITV OF <br />PUBLIC UTILITIES <br />Board Memorandum <br />BOARD OF PUBLIC UTILITIES DATE: JANUARY 23, 2017 <br />GENERAL MANAGERS REPORT <br />ITEM NO: 16 <br />SUBJECT: MONTHLY POWER SUPPLY REPORT — November 2016 <br />Power Usage: <br />Wholesale Load (Vista): — 166,847 MWH (Chart 1) <br />Peak Demand: — 354 MW of which 251 MW came from RVSD available resources (Chart 2) <br />RVSD Energy Mix (Chart 1): <br />Resource MWH <br />a) Nuclear <br />8,204 <br />b) Coal <br />50,743 <br />c) Large Hydroelectric <br />2,477 <br />d) Natural Gas <br />5,213 <br />e) Renewables <br />44,661 <br />f) Inter SC Trades <br />234 <br />g) Green Inter SC Trades <br />- <br />h) CAISO Purchases <br />55,315 <br />Total: <br />166,847 <br />Total Green Power Supply — 44,661 MWH which yields 26.77% of the Total Wholesale Load Requirement <br />Resource Availability: <br />Nuclear: Palo Verde units 1, 2 and 3 operated at 87.65% capacity factor for the month. <br />Coal: IPP units 1 and 2 operated at 51.44% capacity factor for the month. <br />Large Hydro: Hoover, RVSD's capacity entitlement was 20 MW, with energy entitlement of 2,477 MWH. <br />Natural Gas: Clearwater's availability was 100% for the month. <br />RERC's (Units 1, 2, 3 and 4) availability was 100.00% for the month. <br />Springs's (Units 1, 2, 3 and 4) availability was 100.00% for the month. <br />Renewable: Salton Sea units operated at 54.51 % capacity factor for the month <br />Vulcan unit operated at 86.11 % capacity factor for the month. <br />Wintec operated at 4.47% capacity factor. <br />WKN operated at 12.43% capacity factor. <br />Kingbird Solar operated at 23.92% capacity factor. <br />Tequesquite Solar operated at 17.91 % capacity factor. <br />AP North Lake Solar operated at 18.67% capacity factor. <br />Camelot Solar2 operated at 23.53% capacity factor. <br />Bigsky Solarl X operated at 23.07% capacity factor <br />Bigsky Solar3 operated at 23.26% capacity factor. <br />Bigsky Solar7 operated at 15.46% capacity factor. <br />Transwind operated at 7.33% capacity factor. <br />The attached graphical comparisons represents RPU's November: <br />Chart 1: <br />Total Energy Requirements/Resource Mix <br />Chart 2: <br />Peak Hour Total Capacity <br />Chart 3: <br />Retail Customer Load <br />Chart 4: <br />Daily Peak Load and Temperature Comparisons <br />Chart 5: <br />Monthly Peak Load and Temperature <br />