Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2019 BPU
>
06-10-19
>
06-10-2019 BPU RPT 14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2019 4:49:13 PM
Creation date
6/28/2019 9:53:28 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
W A T E R E N E R G Y T I F F <br />id& <br />P U B L I C U T I L I T I E S <br />BOARD OF PUBLIC UTILITIES <br />RIVERSIDE PUBLIC UTILITIES <br />Board Memorandum <br />DATE: JUNE 10, 2019 <br />ITEM NO: 14 <br />SUBJECT: BID NUMBER RPU -7603 FOR GENERAL ORDER 165 POLE REPLACEMENTS AT <br />VARIOUS LOCATIONS THROUGHOUT CITY WITH ASPLUNDH CONSTRUCTION LLC <br />OF ANAHEIM, CALIFORNIA, IN THE AMOUNT OF $1,545,980.00 — TOTAL CAPITAL <br />EXPENDITURE OF $2,301,305 <br />ISSUES: <br />Award Bid Number RPU -7603 for General Order 165 Pole Replacements at various locations throughout <br />the City to Asplundh Construction LLC of Anaheim, California, in the amount of $1,545,980; and approve <br />the total capital expenditure of $2,301,305 for work associated with the project. <br />RECOMMENDATIONS: <br />That the Board of Public Utilities: <br />1. Award Bid Number RPU -7603 for General Order 165 Pole Replacements at various locations <br />throughout the City to Asplundh Construction LLC of Anaheim, California, in the amount of <br />$1,545,980; and <br />2. Approve the total capital expenditure of $2,301,305 for work associated with the project. <br />BACKGROUND: <br />Pole replacements continue to be a major focus for Riverside Public Utilities (RPU) given their impact on <br />public and worker safety, and their essential role in service reliability to customers. The pole replacement <br />program is a major part of Utility 2.0 and has been broken down into different phases to keep up with the <br />strategic plan for achieving RPU's Utility 2.0 objective. The 100 wooden pole replacement in various <br />locations throughout the City is a planned replacement based upon the results of detailed and intrusive <br />inspections. Detailed inspections identify poles which are at risk of failure and have the potential of <br />becoming a public safety hazard and adversely affect the electric system's reliability. <br />Outage notifications will be issued prior to any work commencement, and any resulting electric service <br />disruptions will be coordinated with customers to minimize any impact. <br />There are multiple work orders associated with replacing 100 utility poles, including transmission, <br />distribution, and secondary poles. The scope of work includes replacing all related overhead equipment, <br />including transformers, cross -arms, and cables and upgrading all related components to comply with <br />current construction standards. <br />
The URL can be used to link to this page
Your browser does not support the video tag.