Laserfiche WebLink
VV A r E R E N E R G Y 17 F F <br />RIVERSIDE PUBLIC UTILITIES <br />W& Board Memorandum <br />P U B L I C U T I L I T I E S <br />BOARD OF PUBLIC UTILITIES DATE: JUNE 10, 2019 <br />ITEM NO: 13 <br />SUBJECT: MEASURE Z - EXTEND FIBER OPTIC CABLE NETWORK FROM MAGNOLIA AND VAN <br />BUREN AVENUES CROSS -CONNECT CABINET TO ARLINGTON PARK - WORK <br />ORDER NUMBER 1923476 IN THE AMOUNT OF $82,534 <br />ISSUE: <br />Approve Work Order Number 1923476 in the amount of $82,534 to extend the fiber optic cable network <br />from Magnolia and Van Buren Avenues cross -connect cabinet to Arlington Park. <br />RECOMMENDATION: <br />That the Board of Public Utilities approve Work Order Number 1923476 in the amount of $82,534 to extend <br />the fiber optic cable network from Magnolia and Van Buren Avenues cross -connect cabinet to Arlington <br />Park. <br />BACKGROUND: <br />The Parks, Recreations, and Community Services (PRCS) Department requested that Riverside Public <br />Utilities (RPU) provide dark fiber to Arlington Park located at 3860 Van Buren Boulevard. The fiber <br />extension will facilitate the network connection to the City's central server located inside City Hall. <br />DISCUSSION: <br />RPU will extend additional fiber optic cable approximately 0.4 miles from the park to the existing cross- <br />connect cabinet at the corner of Magnolia and Van Buren Avenues. Two (2) strands of fiber optic cable <br />with an estimated distance of 9.28 miles per fiber will be leased between Arlington Park and City Hall. <br />Interface with the City's network will be through RPU's fiber optic patch panel at Arlington Park. <br />Funding for the project is budgeted in the PRCS Department's Capital Project Fund. Work order 1923476 <br />includes engineering, equipment procurement, and construction of the extension of the fiber optic cable <br />network. <br />The project/fiscal breakdown is as follows: <br />Project and Fiscal Breakdown <br />Work Type <br />Performed By: <br />Amount ($) <br />Project Management and <br />RPU <br />$21,100 <br />-Engineering <br />Construction: <br />RPU <br />$46,700 <br />Materials <br />$7,100 <br />Contingency <br />$7,600 <br />Work Order Total: <br />$82,500 <br />Reimbursements <br />$82,500 <br />