Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2019 BPU
>
04-22-19
>
04-22-2019 BPU RPT 09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2019 4:21:45 PM
Creation date
6/28/2019 8:37:26 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
W A T E R E N E R G Y T I F F <br />RIVERSIDE PUBLIC UTILITIES <br />id& Board Memorandum <br />P U B L I C U T I L I T I E S <br />BOARD OF PUBLIC UTILITIES DATE: APRIL 22, 2019 <br />ITEM NO: 9 <br />SUBJECT: CABLE REPLACEMENT AT THE BUSINESS COMPLEX NEAR GIBSON STREET AND <br />INDIANA AVENUE - WORK ORDER NO. 1909017 FOR $70,000 <br />ISSUE: <br />Approve Work Order No. 1909017 in the amount of $70,000 for the Cable Replacement at the Business <br />Complex near Gibson Street and Indiana Avenue. <br />RECOMMENDATION: <br />That the Board of Public Utilities approve Work Order No. 1909017 in the amount of $70,000 for the cable <br />replacement at the Business Complex near Gibson Street and Indiana Avenue. <br />BACKGROUND: <br />Existing primary cable -in -conduit from a power pole to an existing underground structure serving the <br />Business Complex near Gibson Street and Indiana Avenue, must be replaced with new conduit and cable. <br />Electric field crews replaced the aged high molecular weight polyethylene (HMPE) cable and transformers <br />throughout this complex last year, and this is the last section remaining of HMPE cable in this complex to <br />be replaced. <br />This project will replace existing aging infrastructure with new conduit and underground electrical <br />distribution facilities to improve the electric service to customers in the area. Replacement of aged <br />underground infrastructure was identified as part of the Utility 2.0 Electric Infrastructure Road Map. <br />DISCUSSION: <br />This project will upgrade the main electrical feed to the Business Complex. The scope of work includes <br />the installation of approximately 292 trench feet of conduit, approximately 1,800 linear feet of new <br />underground primary cable, and related electrical distribution facilities. The work also includes the removal <br />of approximately 1,800 linear feet of aging primary cable. Intermittent electric service disruptions will be <br />coordinated during construction and advanced outage notifications will be issued to minimize the impact <br />on customers. <br />In accordance with the Purchasing Resolution No. 23256, sections 406 and 407, engineering staff solicited <br />informal bids through Energy Delivery's Contractors panel for the civil construction part of the project. <br />Three vendors submitted bids for the specified work. Staff evaluated the bids and deemed Doty Bros. <br />Equipment Company of Norwalk, California, to be the lowest responsive and responsible bidder. The bid <br />was within the engineer's estimated amount of $36,689. The bids are summarized in the table below: <br />
The URL can be used to link to this page
Your browser does not support the video tag.