Laserfiche WebLink
PJ A r F R F N F R c v L I F E <br />RIVERSIDE PUBLIC UTILITIES <br />W& Board Memorandum <br />P U B L I C U T I L I T I E S <br />BOARD OF PUBLIC UTILITIES DATE: APRIL 22, 2019 <br />ITEM NO: 5 <br />SUBJECT: BID NO. RPU - 1823108 FOR THE CONDUIT AND CABLE REPLACEMENT ON <br />BOLIVAR STREET PROJECT WITH DOTY BROS. EQUIPMENT COMPANY FOR <br />$71,748.16 AND WORK ORDER NO. 1823108 FOR $107,000 <br />ISSUES: <br />Award Bid No. RPU - 1823108 to Doty Bros. Equipment Company for the Conduit and Cable Replacement <br />on Bolivar Street Project, in the amount of $71,748.16; and approve Work Order No. 1823108 in the <br />amount of $107,000. <br />RECOMMENDATIONS: <br />That the Board of Public Utilities: <br />Award Bid No. RPU - 1823108 to Doty Bros. Equipment Company in Norwalk, California for the <br />Conduit and Cable Replacement on Bolivar Street Project, in the amount of $71,748.16; and <br />2. Approve Work Order No. 1823108 in the amount of $107,000. <br />BACKGROUND: <br />Existing primary cable -in -conduit along Bolivar Street and Kipling Court must be replaced with new conduit <br />and cable due to cable failure in the distribution system. Electric field crews restored electric service to <br />the area by switching to an alternate temporary source in the vicinity. Installation of new conduit and cable <br />is required to restore the electrical distribution system to its normal operating configuration. <br />This project will replace existing aging infrastructure with new conduit and underground electrical <br />distribution facilities to improve system reliability and safety, improve power quality and service to customer <br />in the area, and replace aging infrastructure that's beyond its useful life. Replacement of deteriorated <br />cables and related underground distribution facilities is identified as part of the Utility 2.0 Electric <br />Infrastructure Road Map. <br />DISCUSSION: <br />The project will upgrade electric distribution facilities on Kipling Court and Bolivar Street, south of Pecan <br />Place. The scope of work includes the installation of approximately 284 trench feet of conduit, 304 linear <br />feet of new underground primary cable, and related electrical distribution facilities, as well as street paving <br />and concrete repairs. The scope of work also includes the removal of 304 linear feet of deteriorated <br />primary cable. Intermittent electric service disruptions will be coordinated during construction and <br />advanced outage notifications will be issued to minimize the impact on customers. <br />