Laserfiche WebLink
W A T E R E N E R G Y T I F F <br />RIVERSIDE PUBLIC UTILITIES <br />id& Board Memorandum <br />P U B L I C U T I L I T I E S <br />BOARD OF PUBLIC UTILITIES DATE: APRIL 22, 2019 <br />ITEM NO: 4 <br />SUBJECT: WORK ORDER NO. 1917203 FOR AUTO CENTER RELIABILITY PROJECT <br />PHASE 1 IN THE AMOUNT OF $250,000 <br />ISSUE: <br />Approve Work Order No. 1917203 for the Auto Center Reliability Project Phase 1 in the amount of <br />$250,000. <br />RECOMMENDATION: <br />That the Board of Public Utilities approve Work Order No. 1917203 in the amount of $250,000 for the Auto <br />Center Reliability Project Phase 1. <br />BACKGROUND: <br />Riverside Public Utilities (RPU) Electric System Planning staff performed a reliability study to improve <br />performance in the Auto Center area due to numerous outages associated with Circuit 1351 within the <br />past year. The Auto Center reliability study identified system risks that could result in additional outages <br />and recommended the implementation of appropriate system enhancements to reduce outage duration <br />and outage frequency, improve time to identify and communicate fault locations and fault isolations, reduce <br />or eliminate travel time to fault locations, and to improve communication to customers during outages. <br />In response, staff has recommended the installation of grid sensors and automatic reclosers on sections <br />of Circuit 1351 as part of the overall improvements. The grid sensors remotely monitor circuits for faults <br />and outages and report directly to the Grid Control Center (or Dispatch), reducing the response time for <br />troubleshooters and electric field crews, thereby reducing outage duration and improving overall system <br />reliability. The devices are pole -mounted circuit breakers equipped with a mechanism that can <br />automatically open to clear a fault, preventing the substation circuit breaker from interrupting the entire <br />circuit. The automatic recloser may also test the line and restore service after clearing a temporary fault. <br />DISCUSSION: <br />The scope of work for this project includes the installation of grid sensors on two (2) overhead poles and <br />the installation of automatic reclosers on two (2) additional overhead poles for distribution automation. <br />The location of these poles are within the vicinity of Indiana Avenue between Madison and Monroe Streets, <br />on Circuit 1351. <br />