Laserfiche WebLink
WATER i ENERGY I LIF E <br />RIVERSIDE PUBLIC UTILITIES <br />ld& <br />PUBLIC UTILITIES <br />Board Memorandum <br />BOARD OF PUBLIC UTILITIES DATE APRIL 8, 2019 <br />GENERAL MANAGERS REPORT <br />ITEM NO: <br />SUBJECT: MONTHLY POWER SUPPLY REPORT — February, 2019 <br />Power Usage: <br />Wholesale Load (Vista): — 152,498 MWH (Chart 1) <br />Peak Demand: — 290 MW of which 255 MW came from RVSD available resources (Chart 2) <br />RVSD Enerav Mix (Chart 1 <br />Total Green Power Supply — 65,967 MWH which yields 43.26% of the Total Wholesale Load Requirement <br />Resource Availabilit <br />Nuclear: Palo Verde units 1, 2 and 3 operated at 97.87% capacity factor for the month. <br />Coal: IPP units 1 and 2 operated at 68.70% capacity factor for the month. <br />Large Hydro: Hoover, RVSD's capacity entitlement was 20 MW, with energy entitlement of 2,152 MWH. <br />Natural Gas: Clearwater's availability was 100.00% for the month. <br />RERC's (Units 1, 2, 3 and 4) availability was 93.91 % for the month. <br />Springs's (Units 1, 2, 3 and 4) availability was 100.00% for the month. <br />Renewable: Salton Sea units operated at 87.56% capacity factor for the month <br />Resource <br />MWH <br />a) <br />Nuclear <br />8,550 <br />b) <br />Coal <br />63,244 <br />c) <br />Large Hydroelectric <br />2,152 <br />d) <br />Natural Gas <br />9,962 <br />e) <br />Renewables <br />65,967 <br />f) <br />Inter SC Trades <br />- <br />g) <br />Green Inter SC Trades <br />- <br />h) <br />CAISO Purchases <br />2,924 <br />Chart 3: <br />Total: <br />152,498 <br />Total Green Power Supply — 65,967 MWH which yields 43.26% of the Total Wholesale Load Requirement <br />Resource Availabilit <br />Nuclear: Palo Verde units 1, 2 and 3 operated at 97.87% capacity factor for the month. <br />Coal: IPP units 1 and 2 operated at 68.70% capacity factor for the month. <br />Large Hydro: Hoover, RVSD's capacity entitlement was 20 MW, with energy entitlement of 2,152 MWH. <br />Natural Gas: Clearwater's availability was 100.00% for the month. <br />RERC's (Units 1, 2, 3 and 4) availability was 93.91 % for the month. <br />Springs's (Units 1, 2, 3 and 4) availability was 100.00% for the month. <br />Renewable: Salton Sea units operated at 87.56% capacity factor for the month <br />Vulcan unit operated at 83.65% capacity factor for the month. <br />Wintec operated at 4.20% capacity factor. <br />WKN operated at 1.32% capacity factor. <br />Transwind operated at 11.14% capacity factor. <br />Kingbird Solar operated at 22.30% capacity factor. <br />Tequesquite Solar operated at 16.78% capacity factor. <br />AP North Lake Solar operated at 17.31 % capacity factor. <br />Camelot Solar2 operated at 24.54% capacity factor. <br />Bigsky Solar3 operated at 22.83% capacity factor. <br />Bigsky Solar7 operated at 19.82% capacity factor. <br />Bigsky Solarl X operated at 21.32% capacity factor. <br />The attached graphical comparisons represents RPU's February: <br />Chart 1: <br />Total Energy Requirements/Resource Mix <br />Chart 2: <br />Peak Hour Total Capacity <br />Chart 3: <br />Retail Customer Load <br />Chart 4: <br />Daily Peak Load and Temperature Comparisons <br />Chart 5: <br />Monthly Peak Load and Temperature <br />