Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2019 BPU
>
01-14-19
>
01-14-2019 BPU RPT 26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2019 2:43:33 PM
Creation date
6/28/2019 7:27:31 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
WATER i ENERGY I LIF E <br />RIVERSIDE PUBLIC UTILITIES <br />ld& <br />PUBLIC UTILITIES <br />Board Memorandum <br />BOARD OF PUBLIC UTILITIES DATE JANUARY 14, 2019 <br />GENERAL MANAGERS REPORT <br />ITEM NO: <br />SUBJECT: MONTHLY POWER SUPPLY REPORT — November, 2018 <br />Power Usage: <br />Wholesale Load (Vista): — 162,580 MWH (Chart 1) <br />Peak Demand: — 324 MW of which 302 MW came from RVSD available resources (Chart 2) <br />RVSD Enerav Mix (Chart 1 <br />Total Green Power Supply — 57,122 MWH which yields 35.13% of the Total Wholesale Load Requirement <br />Resource Availabilit <br />Nuclear: Palo Verde units 1, 2 and 3 operated at 67.43% capacity factor for the month. <br />Coal: IPP units 1 and 2 operated at 72.41% capacity factor for the month. <br />Large Hydro: Hoover, RVSD's capacity entitlement was 20 MW, with energy entitlement of 2,327 MWH. <br />Natural Gas: Clearwater's availability was 100.00% for the month. <br />RERC's (Units 1, 2, 3 and 4) availability was 50.20% for the month. <br />Springs's (Units 1, 2, 3 and 4) availability was 100.00% for the month. <br />Renewable: Salton Sea units operated at 80.79% capacity factor for the month <br />Resource <br />MWH <br />a) <br />Nuclear <br />6,311 <br />b) <br />Coal <br />71,426 <br />c) <br />Large Hydroelectric <br />2,327 <br />d) <br />Natural Gas <br />1,419 <br />e) <br />Renewables <br />57,122 <br />f) <br />Inter SC Trades <br />8,450 <br />g) <br />Green Inter SC Trades <br />- <br />h) <br />CAISO Purchases <br />15,525 <br />Chart 3: <br />Total: <br />162,580 <br />Total Green Power Supply — 57,122 MWH which yields 35.13% of the Total Wholesale Load Requirement <br />Resource Availabilit <br />Nuclear: Palo Verde units 1, 2 and 3 operated at 67.43% capacity factor for the month. <br />Coal: IPP units 1 and 2 operated at 72.41% capacity factor for the month. <br />Large Hydro: Hoover, RVSD's capacity entitlement was 20 MW, with energy entitlement of 2,327 MWH. <br />Natural Gas: Clearwater's availability was 100.00% for the month. <br />RERC's (Units 1, 2, 3 and 4) availability was 50.20% for the month. <br />Springs's (Units 1, 2, 3 and 4) availability was 100.00% for the month. <br />Renewable: Salton Sea units operated at 80.79% capacity factor for the month <br />Vulcan unit operated at 83.15% capacity factor for the month. <br />Wintec operated at 16.05% capacity factor. <br />WKN operated at 5.01 % capacity factor. <br />Transwind operated at 14.420% capacity factor. <br />Kingbird Solar operated at 22.33% capacity factor. <br />Tequesquite Solar operated at 16.60% capacity factor. <br />AP North Lake Solar operated at 18.23% capacity factor. <br />Camelot Solar2 operated at 20.28% capacity factor. <br />Bigsky Solar3 operated at 22.34% capacity factor. <br />Bigsky Solar7 operated at 18.92% capacity factor. <br />Bigsky Solarl X operated at 21.66% capacity factor. <br />The attached graphical comparisons represents RPU's November: <br />Chart 1: <br />Total Energy Requirements/Resource Mix <br />Chart 2: <br />Peak Hour Total Capacity <br />Chart 3: <br />Retail Customer Load <br />Chart 4: <br />Daily Peak Load and Temperature Comparisons <br />Chart 5: <br />Monthly Peak Load and Temperature <br />
The URL can be used to link to this page
Your browser does not support the video tag.