Laserfiche WebLink
PJ A r F R F N F R c v L I F E <br />RIVERSIDE PUBLIC UTILITIES <br />W& Board Memorandum <br />P U B L I C U T I L I T I E S <br />BOARD OF PUBLIC UTILITIES DATE: JANUARY 14, 2019 <br />ITEM NO: 10 <br />SUBJECT: AGREEMENT WITH SCHINDLER ELEVATOR CORPORATION, OF SAN DIEGO, <br />CALIFORNIA, IN THE AMOUNT OF $1,151,578 AND CONTINGENCY OF 15% FOR A <br />TOTAL AMOUNT NOT TO EXCEED $1,324,315 IN RESPONSE TO BID NO. 7607 FOR <br />ELEVATOR MODERNIZATION OF MISSION SQUARE PROJECT — WORK ORDER <br />NO. 1719865 IN THE AMOUNT OF $1,500,000 <br />ISSUES: <br />Approve an agreement with Schindler Elevator Corporation, of San Diego, California, in the amount of <br />$1,151,578 in response to Bid No. 7607 for the elevator modernization of Mission Square project located <br />at 3750 University Avenue; approve contingency of 15%, or $172,737; and approve Work Order No. <br />1719865 in the amount of $1,500,000. <br />RECOMMENDATIONS: <br />That the Board of Public Utilities: <br />1. Award Bid No. 7607 to Schindler Elevator Corporation, of San Diego, California, in the amount of <br />$1,151,578 for the elevator modernization of Mission Square project; <br />2. Authorize a 15%, or $172,737, contingency for unforeseen conditions or required modifications, <br />including but not limited to owner requested changes and improvements, and authorize staff to <br />issue appropriate change orders not to exceed that amount; <br />3. Approve Work Order No. 1719865 in the amount of $1,500,000; and <br />4. Authorize the City Manager or his designee, to execute the agreement with Schindler Elevator <br />Corporation and make any minor or non -substantive changes. <br />BACKGROUND: <br />On October 13, 2015, the City acquired the Mission Square Office Building at 3750 University Avenue <br />(Property), which was funded by Riverside Public Utilities (RPU). As such, the City is now the landlord of <br />the Property. The Property consists of approximately 127,533 square feet of rentable office and retail <br />space in a six -story building, plus a basement level and a 490 stall parking garage situated on <br />approximately 2.5 acres of land. <br />On March 13, 2017, the Board of the Public Utilities conceptually approved the elevator modernization of <br />the mechanical systems and passenger cab refurbishment project for an estimated amount of $1,500,000. <br />