Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Minutes
>
2018 BPU
>
01-08-2018 BPU MINUTES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2018 10:32:38 AM
Creation date
3/8/2018 10:15:34 AM
Metadata
Fields
Template:
General
Department
Public Utilities
General - Type
Agendas
Document Relationships
01-08-2018 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2018 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
CITY OF RIVERSIDE <br />BOARD OF PUBLIC UTILITIES <br />Minutes of: Meeting of the Board of Public Utilities <br />Date of Meeting: January 8, 2018 <br />Time of Meeting: 6:30 p.m. <br />Place of Meeting: Art Pick Council Chambers <br />3900 Main Street (at Main and Tenth Streets) <br />Riverside, California <br />PLEDGE OF ALLEGIANCE TO THE FLAG WAS GIVEN <br />Roll Call <br />Present: Dave Austin (chair) David Crohn <br />Kevin Foust Gil Oceguera <br />Jo Lynne Russo -Pereyra Elizabeth Sanchez-Monville <br />Andrew Walcker <br />Absent: Jennifer O'Farrell (absence due to illness). <br />PRESENTATIONS <br />1 EMPLOYEE RECOGNITION AWARD OF JESSICA TONKOVICH, UTILITY <br />INFORMATION ASSISTANT <br />The Board of Public Utilities recognized Jessica Tonkovich, Utility Information Assistant, for <br />her hard work and dedication to Riverside Public Utilities and the City of Riverside. <br />2 EMPLOYEE RECOGNITION AWARD TO THE RIVERSIDE TESLA PROJECT TEAM <br />The Board of Public Utilities recognized the following employees with the addition of Efren <br />Mejia, Principal Engineer, for their excellent work on successfully implementing the new <br />Mission Square Tesla Charging Station project while streamlining the plan check process, <br />inspection, and construction coordination while providing superior customer service. <br />• Efren Mejia, Principal Engineer <br />• Summer Ayala — Supervising Engineering Technician <br />• Ana Naranjo — Engineering Aide <br />• Jeff Beck —Sr. Engineering Aide <br />• Gerald Buydos — Sr. Account Manager <br />• Greg Yates — Construction Inspector II <br />• Kelly Stone — Electric Supervisor for Crew 127 <br />• Jeff Hill — Electric Superintendent <br />• Alex Nevarez — Dispatcher I I <br />• Chris Christopoulos — Building Official <br />• Sharon Alvarez — Building and Safety Permit Technician <br />• Jon Russey — Building and Safety Plans Examiner <br />• Fred Cerda — Public Works Chief Construction Inspector <br />• Jim Stone — Public Works Construction Inspector II <br />• David Hatch — Public Works Construction Inspector II <br />
The URL can be used to link to this page
Your browser does not support the video tag.