Laserfiche WebLink
2nd Amendment to the IFA for RTRP • Page 2 <br />state electric transmission grid addressing the capacity and reliability needs of the City. <br />SCE's participation and cost recovery is subject to California Independent System Operator <br />(CAISO) and California Public Utility Commission (CPUC) approvals. CAISO approved the <br />project in September 2006. The CPUC approval process is ongoing. SCE is also subject to its <br />Transmission Owner Tariff rules and Federal Energy Regulatory Commission (FERC) approvals, <br />including FERC approval of interconnection facilities agreements between SCE and applicants. <br />The interconnection facilities agreement between RPU and SCE sets the forth terms and <br />conditions for SCE to work on RTRP. <br />Following negotiations between the parties, the first Interconnection Facilities Agreement <br />(Agreement) between RPU and SCE was approved by City Council (Council) in March 2009, and <br />certified by FERC in April 2009. In August 2010, Council approved amending the Agreement to <br />reflect changes to the Facilities Cost and Payment Schedule. In November 2010, FERC accepted <br />the First Amendment to the Agreement for filing. <br />Consistent with the Agreement, SCE will construct, own and operate Wildlife Switchyard. RPU <br />will construct, own and operate the Wilderness Substation. <br />SCE PRE -RTRP SCE <br />MIRA LOMA EXISTING VISTA <br />SUBSTATION SUBSTATION <br />SCE 230KV TRANSMISSION LINES <br />ML <br />SCE 230KV TRANSMISSION LINES <br />SCE <br />SEVEN 69KV CIRCUITS SERVE RIVERSIDE RPU <br />MIRA LOMA <br />SUBSTATION <br />ML <br />POST -RTRP <br />EXISTING SCE 230KV LINES <br />NEW SCE 230KV <br />TRANSMISSION LINES —pi. <br />CONNECTING MIRA LOMA <br />- WILDLIFE - VISTA <br />SCE WILDLIFE <br />SWITCHYARD <br />RPU WILDERNESS <br />SUBSTATION <br />VI STA <br />SUBSTATION <br />CITY OF <br />RIVERSIDE <br />SINGLE CONNECTION TO THE STATE GRID TWO CONNECTIONS TO THE STATE GRID <br />SCE is responsible for the total cost of the California's Independent System Operator (CAISO) <br />controlled facilities once approval for RTRP is secured at the CPUC. CAISO manages the flow <br />of electricity across high-voltage, long distance power lines that transmit power statewide. RPU <br />is responsible for the total cost of the RTRP service facilities installed for the exclusive benefit of <br />RPU. <br />MIRA LOMA <br />SUBSTATION <br />ML <br />POST - RTRP VISTA <br />SUBSTATION <br />11 <br />SCE <br />WILDLIFE <br />SWITCHYARD <br />RPU <br />WILDERNESS <br />SUBSTATION <br />V <br />CAISO <br />CONTROLLED <br />FACILITIES <br />SERVICE <br />FACILITIES <br />CAISO CONTROLLED FACILITIES / NON-CAISO CONTROLLED FACILITIES <br />