Home
Clerk
>
City Council/Agency Reports
>
2010s
>
2018
>
March
>
03-13-2018
>
03-13-18 CC RPT 04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2018 3:15:59 PM
Creation date
3/1/2018 3:14:50 PM
Metadata
Fields
Template:
General
General - Type
City Council Reports
Document Relationships
03-13-2018 CC AGENDA
(Superseded by)
Path:
\City Council Agendas\2010-2019\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
CITY OF <br />RJVER.SIDE <br />City 0J Arts &Innovation <br />City Council Memorandum <br />IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII <br />TO: HONORABLE MAYOR AND CITY COUNCIL DATE: MARCH 13, 2018 <br />FROM: PUBLIC UTILITIES DEPARTMENT WARDS: ALL <br />SUBJECT: ENGINEERING, DESIGN AND CONSTRUCTION LETTER AGREEMENT <br />BETWEEN SOUTHERN CALIFORNIA EDISON COMPANY AND THE CITY OF <br />RIVERSIDE FOR WORK ASSOCIATED WITH EXISTING METERING PULSE <br />TOTALIZER AND CALIFORNIA INDEPENDENT SYSTEM OPERATOR <br />METERING AT VISTA SUBSTATION FOR $782,757.04 <br />ISSUE: <br />Approve the Engineering, Design and Construction Letter Agreement between Southern <br />California Edison Company and the City of Riverside for work associated with existing metering <br />pulse totalizer units and California Independent System Operator metering at Vista Substation for <br />$782,757.04. <br />RECOMMENDATIONS: <br />That the City Council: <br />1. Approve the Engineering, Design and Construction Letter Agreement with Southern <br />California Edison Company for the work associated with existing metering pulse totalizer <br />units and California Independent System Operator metering at Vista Substation in the <br />amount of $782,757.04; and <br />2. Authorize the City Manager, or his designee, to execute the Engineering, Design and <br />Construction Letter Agreement with Southern California Edison Company, including <br />making minor non -substantive changes, and to sign all documents necessary to complete <br />the transaction for filing with the Federal Energy Regulatory Commission by Southern <br />California Edison Company. <br />BOARD RECOMMENDATION: <br />On February 26, 2018, the Board of Public Utilities unanimously voted to recommend that the City <br />Council approve the Engineering, Design and Construction Letter Agreement between Southern <br />California Edison Company ("SCE") and the City of Riverside for work associated with existing <br />metering pulse totalizer units and California Independent System Operator metering at Vista <br />Substation for $782,757.04. <br />
The URL can be used to link to this page
Your browser does not support the video tag.