Laserfiche WebLink
I <br />J � <br />P U B L I C U T I L I T I E S <br />BOARD OF PUBLIC UTILITIES <br />RIVERSIDE PUBLIC UTILITIES <br />Board Memorandum <br />DATE: AUGUST 8, 2016 <br />ITEM NO: 7 <br />SUBJECT: APPROVAL OF A CAPITAL EXPENDITURE TO REPLACE LAND SURVEYING <br />EQUIPMENT FOR THE BENEFIT OF THE RIVERSIDE PUBLIC UTILITIES <br />DEPARTMENT — WORK ORDER NO. 1702584 FOR $125,000 <br />ISSUE: <br />The issue for Board of Public Utilities consideration is to approve a capital expenditure in the amount of <br />$125,000 for Work Order No. 1702584 to reimburse the Public Works Department for replacement land <br />surveying equipment that benefits the Riverside Public Utilities Department. <br />RECOMMENDATION: <br />That the Board of Public Utilities approve a capital expenditure of $125,000 for Work Order No. 1702584 <br />to reimburse the Public Works Department for replacement land surveying equipment that benefits the <br />Riverside Public Utilities Department. <br />BACKGROUND: <br />Riverside Public Utilities (RPU) performs in -house engineering design and construction management <br />services for many of its capital improvement projects. These designs are based upon land surveys of the <br />project site performed by a licensed land surveyor (surveyor). The survey provides precise locations of <br />existing features such as trees, street lights, electrical poles and other fixed objects and assists in locating <br />underground utilities and property lines. In addition, once the design is complete and a contractor is hired, <br />the surveyor provides markings and other information to assist the contractor with constructing the project. <br />For several years, RPU has obtained its surveys from the Public Works Department (PW). Originally, PW <br />had only one survey crew and RPU had significant waiting periods before receiving the necessary data. <br />In order to receive better service, RPU agreed to outfit a second PW survey crew that would be dedicated <br />primarily to meeting RPU's needs. In analyzing the options, RPU found that outfitting and utilizing a PW <br />survey crew is more cost effective than hiring outside consultants, especially considering a variety of <br />factors, including economical rates, previous work throughout the City of Riverside and institutional <br />knowledge. In July 2006, the Board of Public Utilities (Board) approved a capital expenditure of $135,000 <br />to purchase land surveying equipment to support this second survey crew. The two survey crews may <br />sometimes be interchanged depending on project schedules and workflow. Charges are appropriately <br />accounted for on individual's timecards. On the infrequent occasion that one of the two crews is not <br />occupied with RPU projects, the second crew can be utilized for non -RPU projects, and their expenses <br />would be charged accordingly. <br />DISCUSSION: <br />The land surveying equipment is now over ten years old. Repair and replacement parts are not readily <br />available, and the equipment software is no longer supported. The equipment has become worn and <br />outdated and needs to be replaced. The replacement equipment will consist of industry standard high - <br />precision land surveying equipment. PW will take the lead to procure the replacement equipment. RPU <br />will reimburse PW for the cost of the procurement in an amount not to exceed $125,000. <br />The purchase of replacement land surveying equipment will help ensure that RPU continues to receive <br />accurate and expedient land surveying service and will help achieve the goals of renewing capital <br />