Laserfiche WebLink
W A T E R I E N E R G Y I L I F E <br />awRIVERSIDE PUBLIC UTILITIES <br />WI& Board Memorandum <br />PUBLIC UTILITIES Oa d M e m o a n du <br />BOARD OF PUBLIC UTILITIES DATE: JULY 11, 2016 <br />SUBJECT: MONTHLY POWER SUPPLY REPORT — May 2016 <br />Power Usage: <br />Wholesale Load (Vista): <br />Peak Demand: <br />RVSD Energy Mix (Chart 1): <br />Resource <br />a) Nuclear <br />b) Coal <br />c) Large Hydroelectric <br />d) Natural Gas <br />e) Renewables <br />f) Inter SC Trades <br />g) Green Inter SC Trades <br />h) CAISO Purchases <br />Total Green Power Supply <br />Resource Availabilit <br />GENERAL MANAGERS REPORT <br />ITEM NO: 14 <br />173,922 MWH (Chart 1) <br />360 MW of which 276 MW came from RVSD available resources (Chart 2) <br />MWH <br />7,465 <br />42,659 <br />2,831 <br />2,164 <br />70,466 <br />20,000 <br />28,408 <br />Total: 173,992 <br />70,466 MWH which yields 40.50% of the Total Wholesale Load Requirement <br />Nuclear: Palo Verde units 1, 2 and 3 operated at 77.11 % capacity factor for the month. <br />Coal: IPP units 1 and 2 operated at 41.85% capacity factor for the month. <br />Large Hydro: Hoover, RVSD's capacity entitlement was 18 MW, with energy entitlement of 2,831 MWH. <br />Natural Gas: Clearwater's availability was 100.00% for the month. <br />RERC's (Units 1, 2, 3 and 4) availability was 99.63% for the month. <br />Springs's (Units 1, 2, 3 and 4) availability was 100.00% for the month. <br />Renewable: Salton Sea units operated at 96.86% capacity factor for the month <br />Vulcan unit operated at 96.57% capacity factor for the month. <br />Wintec operated at 56.87% capacity factor. <br />WKN operated at 62.57% capacity factor. <br />Kingbird Solar operated at 43.84% capacity factor. <br />Tequesquite Solar operated at 29.07% capacity factor. <br />AP North Lake Solar operated at 19.36% capacity factor. <br />Camelot Solar operated at 41.84% capacity factor. <br />Transwind operated at 24.33% capacity factor. <br />The attached graphical comparisons represents RPU's May: <br />Chart 1: <br />Total Energy Requirements /Resource Mix <br />Chart 2: <br />Peak Hour Total Capacity <br />Chart 3: <br />Retail Customer Load <br />Chart 4: <br />Daily Peak Load and Temperature Comparisons <br />Chart 5: <br />Monthly Peak Load and Temperature <br />