Laserfiche WebLink
W A T E R E N E R L Y I. I F F <br />UE=�� III& <br />P U B L I C U T I L I T I E S <br />BOARD OF PUBLIC UTILITIES <br />RIVERSIDE PUBLIC UTILITIES <br />Board Memorandum <br />DATE: JUNE 27, 2016 <br />ITEM NO: 9 <br />SUBJECT: IMPROVEMENTS TO THE UTILITY OPERATIONS CENTER WOMEN AND MEN'S <br />LOCKER ROOMS — APPROVAL TO PURCHASE FURNITURE FROM G/M BUSINESS <br />INTERIORS OF RIVERSIDE, CA, IN ACCORDANCE WITH PURCHASING <br />RESOLUTION NO. 22576, SECTION 201 (G) IN THE AMOUNT OF $323,829 AND <br />AUTHORIZE WORK ORDER NO. 1606361 FOR $362,829 <br />ISSUES: <br />The items for Board of Public Utilities consideration are to approve the purchase furniture from G/M <br />Business Interiors in accordance with Purchasing Resolution No. 22576, Section 201 (g); and approve <br />Work Order No. 1606361 in the amount of $362,829. <br />RECOMMENDATIONS: <br />That the Board of Public Utilities: <br />Approve the issuance of a purchase order in the amount of $323,829 to G/M Business Interiors <br />for the procurement of furniture including lockers and benches in accordance with Purchasing <br />Resolution No. 22576, Section 201 (g); and <br />2. Authorize the estimated capital expenditure for Work Order No. 1606361 in the amount of <br />$362,829. <br />BACKGROUND: <br />The Utilities Operations Center was completed in 1996 and the men's and women's locker rooms are <br />original to the building. The current lockers do not meet the needs of Electric and Water field personnel to <br />accommodate their standard issued uniforms, the size of the required equipment bag for the Electric Power <br />Line Technicians, and there is no secure space for employee's personal items. There are not enough <br />lockers to accommodate all of the field personnel and therefore, a makeshift locker room was set up in <br />Building B which needs to be addressed. The lighting in the locker rooms is insufficient and there is limited <br />seating available for staff to use in preparation of going out into the field. <br />The improvement project includes upgrading to new LED lighting, painting, replace ceiling tiles, install non- <br />slip flooring, replace and enhance bench seating, as well as installation of new lockers that have been <br />specified to meet the needs of both the Electric and Water field personnel. For example, the Electric lineman <br />need a deeper locker to accommodate their equipment bag that is approximately 29 inches in length and <br />weighs 50 pounds. Comparatively, Water staff do not carry equipment bags and can have a smaller locker <br />to house their uniform and other personal effects. <br />The construction which includes new and upgraded lighting, painting and replacement of ceiling tiles to meet <br />current safety standards will be done by in -house building maintenance staff. The flooring will be completed <br />by a contractor; the cost is less than $50,000 and will be procured in accordance with Purchasing Resolution <br />No. 22576. <br />