Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2016 BPU
>
06-27-16
>
06-27-2016 BPU RPT 05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2016 4:46:05 PM
Creation date
9/6/2016 3:32:33 PM
Metadata
Fields
Template:
General
General - Type
Agendas
Document Relationships
06-27-2016 BPU AGENDA
(Cover Page)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2016 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
W A T E R E N E R C, I <br />id& <br />PUBLIC UTILITIES <br />BOARD OF PUBLIC UTILITIES <br />RIVERSIDE PUBLIC UTILITIES <br />Board Memorandum <br />DATE: JUNE 27, 2016 <br />ITEM NO: 5 <br />SUBJECT: INSTALLATION OF CIRCUIT TIE ON PALM AVENUE SOUTH OF TEQUESQUITE <br />AVENUE FOR CIRCUIT 454, CONSTRUCTION BY CONTRACTOR PANEL AND <br />ELECTRIC FIELD CREWS — WORK ORDER NO. 1606533 FOR $228,000 <br />ISSUE: <br />The issue for Board of Public Utilities consideration is approval of the capital expenditure of $228,000 for <br />Work Order No. 1606533 for the installation of a circuit tie along Palm Avenue for Circuit 454. <br />RECOMMENDATION: <br />That the Board of Public Utilities approve the estimated capital expenditure of $228,000 for Work Order <br />No. 1606533 for the installation of a circuit tie along Palm Avenue for Circuit 454. <br />BACKGROUND: <br />The Electric System Master Plan (ESMP) recommends the conversion of all remaining 4kV to 12kV <br />distribution circuits to improve system capacity and reliability. This project is an important step in that it <br />will facilitate the conversion of circuit 454 to 12kV by creating extra ties to an existing 12kV circuit in the <br />vicinity. <br />The work will upgrade electric distribution facilities along Palm Avenue, south of Tequesquite Avenue. <br />The overhead work includes the replacement of one wooden pole, 240 circuit feet of primary wires, and <br />related overhead distribution facilities. The underground work includes the replacement of 1,870 circuit <br />feet of primary underground cables, installation of two vaults, two electric service boxes, one transformer <br />pad, one transformer, 100 trench feet of conduit, and related underground distribution facilities. <br />Riverside Public Utilities (RPU) engineering staff performed the design to eliminate any negative visual <br />impacts to the project and surrounding area, with sensitivity to the existing neighborhood, and within City <br />Planning guidelines for the designated area of the project. <br />The project breakdown is proposed as follows: <br />Project Breakdown <br />Engineering Performed By: <br />RPU engineering staff <br />Civil Construction Performed By: <br />RPU Contractor's Panel <br />Electrical Work Performed By: <br />RPU field forces <br />Anticipated Start Date: <br />July 11, 2016 <br />Anticipated Duration: <br />4 weeks <br />Coordination Required With: <br />RPU Field Superintendent <br />Reimbursements: <br />None <br />