Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2016 BPU
>
04-11-16
>
04-11-2016 BPU RPT 12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2016 11:19:39 AM
Creation date
8/26/2016 11:19:38 AM
Metadata
Fields
Template:
General
General - Type
Misc
Document Relationships
04-11-2016 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2016 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
RIVERSIDE PUBLIC UTILITIES <br />Board Memorandum <br />BOARD OF PUBLIC UTILITIESDATE <br />:APRIL 11, 2016 <br />GENERAL MANAGERS REPORT <br />ITEM NO <br />:12 <br />SUBJECTMONTHLY POWER SUPPLY REPORT – February 2016 <br />: <br />Power Usage: <br />Wholesale Load (Vista): – 159,386 MWH (Chart 1) <br />Peak Demand: – 315 MW of which 243 MW came from RVSD available resources (Chart 2) <br />RVSD Energy Mix (Chart 1): <br />ResourceMWH <br />a)Nuclear8,424 <br />b)Coal42,307 <br />c)LargeHydroelectric2,622 <br />d)Natural Gas4,145 <br />e)Renewables36,010 <br />f)Other (BPA)1,880 <br />g)Inter SC Trades8,666 <br />h)Green Inter SC Trades- <br />i)CAISO Purchases55,332 <br />Total:159,386 <br />Total Green Power Supply – 36,010 MWHwhich yields 22.59% of the Total Wholesale Load Requirement <br />Resource Availability: <br />Nuclear: Palo Verde units 1, 2 and 3 operated at 93.10% capacity factor for the month. <br />Coal: IPP units 1 and 2 operated at 44.37% capacity factor for the month. <br /> <br />Large Hydro: Hoover, RVSD’s capacity entitlement was 18 MW, with energy entitlement of 2,622 MWH. <br />Natural Gas:Clearwater’s availability was 100.00% for the month. <br /> RERC’s (Units 1, 2, 3 and 4) availability was 100.00% for the month. <br /> Springs’s (Units 1, 2, 3 and 4) availability was 100.00% for the month. <br />Renewable: Salton Sea units operated at 51.26% capacity factor for the month. <br />Wintec operated at 14.90% capacity factor. <br />WKN operated at 13.90% capacity factor. <br />Tequesquite Solar operated at 23.24% capacity factor. <br />AP North Lake Solar operated at 25.75% capacity factor. <br />Camelot Solar operated at 30.19% capacity factor. <br />Transwind operated at 10.37% capacity factor. <br />The attached graphical comparisons represents RPU’s February: <br />Chart 1: Total Energy Requirements/Resource Mix <br />Chart 2: Peak Hour Total Capacity <br />Chart 3: Retail Customer Load <br />Chart 4: Daily Peak Load and Temperature Comparisons <br />Chart 5: Monthly Peak Load and Temperature <br />Page 77 <br />
The URL can be used to link to this page
Your browser does not support the video tag.