Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2016 BPU
>
03-14-16
>
03-14-2016 BPU RPT 17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2016 11:36:13 AM
Creation date
5/2/2016 11:11:29 AM
Metadata
Fields
Template:
General
General - Type
Misc
Document Relationships
03-14-2016 BPU AGENDA
(Supersedes)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2016 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
RIVERSIDE PUBLIC UTILITIES <br />Board Memorandum <br />BOARD OF PUBLIC UTILITIESDATE <br />:MARCH 14, 2016 <br />GENERAL MANAGERS REPORT <br />ITEM NO <br />:17 <br />SUBJECTMONTHLY POWER SUPPLY REPORT – January2016 <br />: <br />Power Usage: <br />Wholesale Load (Vista): – 168,380MWH (Chart1) <br />Peak Demand: – 298 MWof which 248MW came from RVSD available resources (Chart2) <br />RVSD Energy Mix (Chart1): <br />ResourceMWH <br />a)Nuclear9,582 <br />b)Coal45,106 <br />c)Large Hydroelectric2,238 <br />d)Natural Gas2,090 <br />e)Renewables42,018 <br />f)Other (BPA) - <br />g)Inter SC Trades(18,920) <br />h)Green Inter SC Trades - <br />i)CAISO Purchases86,266 <br />Total:168,380 <br />Total Green Power Supply – 42,018MWHwhich yields 24.95% of the Total Wholesale Load Requirement <br />Resource Availability: <br />Nuclear: Palo Verde units 1, 2 and 3 operated at 99.07% capacity factor for the month. <br />Coal: IPP units 1 and 2 operated at 44.25% capacity factor for the month. <br />Large Hydro: Hoover, RVSD’s capacity entitlement was 16MW, with energy entitlement of2,238MWH. <br />Natural Gas:Clearwater’s availability was 100.00% for the month. <br /> RERC’s (Units 1, 2, 3 and 4)availability was 88.32% for the month. <br /> Springs’s (Units 1, 2, 3 and 4)availability was 95.43% for the month. <br />Renewable: Salton Sea units operated at 97.26% capacity factor for the month. <br />Wintec operated at 17.16%capacityfactor. <br />WKN operated at 14.89% capacityfactor. <br />Tequesquite Solar operated at 14.29% capacity factor. <br />AP North Lake Solar operated at 16.30% capacity factor. <br />Camelot Solar operated at 17.98% capacity factor. <br />Transwind operated at 10.98% capacity factor. <br />The attached graphical comparisons represents RPU’s January: <br />Chart 1: Total Energy Requirements/Resource Mix <br />Chart2: Peak Hour TotalCapacity <br />Chart3: Retail Customer Load <br />Chart4: Daily Peak Load and TemperatureComparisons <br />Chart 5:MonthlyPeak Load and Temperature <br />Page 237 <br />
The URL can be used to link to this page
Your browser does not support the video tag.