Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2016 BPU
>
02-05-16
>
02-05-2016 BPU RPT 13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/29/2016 4:30:09 PM
Creation date
2/29/2016 2:43:43 PM
Metadata
Fields
Template:
General
General - Type
Agendas
Document Relationships
02-05-2016 BPU AGENDA
(Cover Page)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2016 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
W A T E R 1 E N E R G Y 1 L I F E <br />PUBLIC UTILITIES <br />RIVERSIDE PUBLIC UTILITIES <br />Board Memorandum <br />BOARD OF PUBLIC UTILITIES <br />DATE: FEBRUARY 5, 2015 <br />GENERAL MANAGERS REPORT <br />ITEM NO: 13 <br />SUBJECT: MONTHLY POWER SUPPLY REPORT — December 2015 <br />Power Usage: <br />Wholesale Load (Vista): — 172,433 MWH (Chart 1) <br />Peak Demand: — 298 MW of which 248 MW came from RVSD available resources (Chart 2) <br />RVSD Energy Mix (Chart 1): <br />Resource MWH <br />a) Nuclear 9,582 <br />b) Coal 48,769 <br />c) Large Hydroelectric 2,020 <br />d) Natural Gas 1,594 <br />e) Renewables 39,331 <br />f) Other (BPA) - <br />g) Inter SC Trades (18,100) <br />h) Green Inter SC Trades - <br />i) CAISO Purchases 89,433 <br />Total: 172,433 <br />Total Green Power Supply — 39,331 MWH which yields 22.81% of the Total Wholesale Load <br />Requirement <br />Resource Availability: <br />Nuclear: Palo Verde units 1, 2 and 3 operated at 99.07% capacity factor for the month. <br />Coal: IPP units 1 and 2 operated at 47.85% capacity factor for the month. <br />Large Hydro: Hoover, RVSD's capacity entitlement was 20 MW, with energy entitlement of 2,020 MWH. <br />Natural Gas: Clearwater's availability was 100.00% for the month. <br />RERC's (Units 1, 2, 3 and 4) availability was 100.00% for the month. <br />Springs's (Units 1, 2, 3 and 4) availability was 100.00% for the month. <br />Renewable: Salton Sea units operated at 88.60% capacity factor for the month. <br />Wintec operated at 21.30% capacity factor. <br />WKN operated at 19.59% capacity factor. <br />Tequesquite Solar operated at 15.77% capacity factor. <br />AP North Lake Solar operated at 17.73% capacity factor. <br />Camelot Solar operated at 17.74% capacity factor. <br />Transwind operated at 9.45% capacity factor. <br />The attached graphical comparisons represents RPU's December: <br />Chart 1: Total Energy Requirements /Resource Mix <br />Chart 2: Peak Hour Total Capacity <br />Chart 3: Retail Customer Load <br />Chart 4: Daily Peak Load and Temperature Comparisons <br />Chart 5: Monthly Peak Load and Temperature <br />
The URL can be used to link to this page
Your browser does not support the video tag.