Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2016 BPU
>
01-22-16
>
01-22-2016 BPU RPT 23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2016 9:22:43 AM
Creation date
1/11/2016 3:53:54 PM
Metadata
Fields
Template:
General
General - Type
Agendas
文档关系
01-22-2016 BPU AGENDA
(Cover Page)
路径:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2016 BPU
该页面上没有批注。
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
W A T E R I E N E R G Y I L I F E <br />-NP- RIVERSIDE PUBLIC UTILITIES <br />kl& <br />PUBLIC UTILITIES <br />Board Memorandum <br />BOARD OF PUBLIC UTILITIES DATE: JANUARY 22, 2016 <br />GENERAL MANAGERS REPORT <br />ITEM NO: 23 <br />SUBJECT: MONTHLY POWER SUPPLY REPORT — November 2015 <br />Power Usage: <br />Wholesale Load (Vista): — 161,811 MWH (Chart 1) <br />Peak Demand: — 293 MW of which 216 MW came from RVSD available resources (Chart 2) <br />RVSD Energy Mix (Chart 1): <br />Resource MWH <br />a) Nuclear <br />7,320 <br />b) Coal <br />48,721 <br />c) Large Hydroelectric <br />2,147 <br />d) Natural Gas <br />1,441 <br />e) Renewables <br />41,497 <br />f) Other (BPA) <br />- <br />g) Inter SC Trades <br />9,900 <br />h) Green Inter SC Trades <br />- <br />i) CAISO Purchases <br />50,784 <br />Total: 161,811 <br />Total Green Power Supply — 41,497 MWH which yields 25.65% of the Total Wholesale Load Requirement <br />Resource Availabilit <br />Nuclear: Palo Verde units 1, 2 and 3 operated at 78.21 % capacity factor for the month. <br />Coal: IPP units 1 and 2 operated at 49.39% capacity factor for the month. <br />Large Hydro: Hoover, RVSD's capacity entitlement was 21 MW, with energy entitlement of 2,147 MWH. <br />Natural Gas: Clearwater's availability was 100.00% for the month. <br />RERC's (Units 1, 2, 3 and 4) availability was 93.16% for the month. <br />Springs's (Units 1, 2, 3 and 4) availability was 100.00% for the month. <br />Renewable: Salton Sea units operated at 94.26% capacity factor for the month. <br />Wintec operated at 14.90% capacity factor. <br />WKN operated at 18.58% capacity factor. <br />Tequesquite Solar operated at 48.42% capacity factor. <br />AP North Lake Solar operated at 21.60% capacity factor. <br />Camelot Solar operated at 26.37% capacity factor. <br />Transwind operated at 10.91 % capacity factor. <br />The attached graphical comparisons represents RPU's November: <br />Chart 1: Total Energy Requirements /Resource Mix <br />Chart 2: Peak Hour Total Capacity <br />Chart 3: Retail Customer Load <br />Chart 4: Daily Peak Load and Temperature Comparisons <br />Chart 5: Monthly Peak Load and Temperature <br />
The URL can be used to link to this page
Your browser does not support the video tag.