Laserfiche WebLink
W A T E R E N E R C, I <br />RIVERSIDE PUBLIC UTILITIES <br />W& Board Memorandum <br />PUBLIC UTILITIES <br />BOARD OF PUBLIC UTILITIES DATE: NOVEMBER 20, 2015 <br />ITEM NO: 4 <br />File ID — 15 -3681 — C <br />SUBJECT: UNDERGROUND ELECTRICAL INSTALLATION AT INDIANA AVENUE BETWEEN <br />LAKEPOINTE DRIVE AND CAPRIOLE ROAD FOR NEW TRACT 34236, SEVEN <br />SINGLE FAMILY RESIDENCES - WORK ORDER NO. 1601381 FOR $55,000 <br />ISSUE: <br />The issue for the Board of Public Utilities consideration is to approve a capital expenditure in the amount <br />of $55,000 for Work Order 1601381 for the installation of underground electrical facilities for Tract 34236. <br />RECOMMENDATION: <br />That the Board of Public Utilities approve the estimated capital expenditure of $55,000 for Work Order <br />No. 1601381 for the installation of underground electrical facilities for Tract 34236. <br />BACKGROUND: <br />The project will extend existing electrical distribution facilities to serve seven new single family <br />residences for Tract 34236 located along Indiana Avenue between Lakepointe Drive and Capriole Road. <br />The work includes the installation of approximately 1,000 trench feet of conduit, two pad- mounted <br />transformers, one pad- mounted junction cabinet, five street lights, two pole relocations and related <br />underground electrical facilities. <br />Riverside Public Utilities (RPU) engineering staff performed the design to eliminate any negative visual <br />impacts to the project and surrounding area, with sensitivity to the existing neighborhood, and within City <br />Planning guidelines for the designated area of the project. <br />The project breakdown is proposed as follows: <br />Project Breakdown <br />Engineering Performed By: <br />RPU engineering staff <br />Civil Construction Performed By: <br />Developer at developer's expense <br />Electrical Work Performed By: <br />RPU field forces <br />Anticipated Start Date: <br />November 23, 2015 <br />Anticipated Duration: <br />Six Months <br />Coordination Required With: <br />Developer <br />Reimbursements: <br />100% reimbursable by developer <br />FISCAL IMPACT: <br />The capital expenditure for Work Order No. 1601381 is estimated to be $55,000. Sufficient funds are <br />available in the Electrical Capital Account No. 6130000 - 470626. Consistent with Electric Rules 10 and <br />11, the expenditure will be fully reimbursed by the developer. <br />