Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2010 BPU
>
12-17-10
>
12-17-10 BPU RPT 03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2015 11:41:32 AM
Creation date
10/13/2015 11:41:27 AM
Metadata
Fields
Template:
General
Department
Public Utilities
General - Type
Misc
Document Relationships
12-17-2010 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2010 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
RIVERSIDE PUBLIC UTILITIES <br /> Board Memorandum <br /> tlBl it 11 <br /> BOARD OF PUBLIC UTILITIES DATE: December 17, 2010 <br /> ITEM NO: 3 <br /> SUBJECT: CABLE REPLACEMENT FOR CASA FLORES II APARTMENT COMPLEX AND <br /> MAGNOLIA CONVALESCENT HOSPITAL -WORK ORDER NO. 1104644 <br /> ISSUE: <br /> Board of Public Utilities approval is requested for Work Order No. 1104644. <br /> RECOMMENDATION: <br /> That the Board of Publ c. Utilities approve the estimated capital expenditure of $147,000 to replace out of <br /> date and deterioratinc underground electrical equipment and structures located at Casa Flores II <br /> Apartment Complex and Magnolia Convalescent Hospital along Magnolia Avenue. <br /> BACKGROUND: <br /> The underground electric system in this area is over 41 years old and has been experiencing outages <br /> due to failing High Molecular Poly Ethylene (HMPE) insulated cable. To prevent additional unplanned <br /> outages this project wil replace a total of three transformers as well as approximately 900' of obsolete 15 <br /> kV HMPE cable with our current standard 15 kV underground cable and install new conduit and a Pad- <br /> mount Junction Cabinet. <br /> This project is being completed as a part of the HMPE Cable Replacement Program. <br /> The electrical engineering was performed by Riverside Public Utilities (RPU). All civil work including <br /> trenching, conduits and other infrastructure work will be performed by a contractor through the <br /> competitive bid process. Electrical work will be performed by RPU field forces. <br /> FISCAL IMPACT: <br /> The capital expenditure for the project is estimated to be $147,000 which includes all construction, <br /> contingencies, construction management, inspection and design, as summarized in the following table: <br /> % Of <br /> Total <br /> Design, Construction Management, lnspectian $11,760 8% <br /> Construction-RPU Electrical Work & Materials $22,050 15% <br /> Contgerl 20 of $4,410 -- 3% <br /> Construction-Electric Conduit & Structures $108,780 74% <br /> Subtotal. $1471000 100% <br /> Funds are budgeted and available for this project in the Cable Replacement Account No. 6130000- <br /> 470635. <br />
The URL can be used to link to this page
Your browser does not support the video tag.