Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2010 BPU
>
11-05-10
>
11-05-10 BPU RPT 04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2015 4:24:17 PM
Creation date
10/9/2015 4:24:13 PM
Metadata
Fields
Template:
General
Department
Public Utilities
General - Type
Misc
Document Relationships
11-05-2010 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2010 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
I. ! 1 % F y 1 4 4.r F 1 r it <br /> RIVERSIDE PUBLIC UTILITIES <br /> Board Memorandum <br /> P0HL ? 1; 1 ! !. ! TIES <br /> BOARD OF PUBLIC U`.';CITIES DATE: November 05, 2010 <br /> ITEM NO: 4 <br /> SUBJECT: OVERHEAD CONDUCTOR INSTALLATION CIRCUIT 1260 LOAD RELIEF <br /> WORK ORDER NO. 100004-20 <br /> ISSUE: <br /> Board of Public Utilities approval is requested for Work Order No. 100004-20. <br /> RECOMMENDATION: <br /> That the Board of Public Utilities approve Work Order No. 100004-20 for the estimated capital <br /> expenditure of$72,200 -.o replace overhead conductor for Circuit 1260. <br /> BACKGROUND: <br /> This load relief project for Circuit 1260 will require the removal and replacement of 3200 feet of overhead <br /> conductor along WasNngton Street and the installation of one (1) overhead pull-switch at California <br /> Avenue and Via San Lu s to relieve the possible overload conditions for summer 2011. <br /> The electrical engineering will be performed by Riverside Public Utilities (RPU). Electrical work will be <br /> performed by RPU field forces. <br /> FISCAL IMPACT: <br /> The total estimated cost for Work Order No. 100004-20 is $72,200. <br /> % of Total <br /> Construction-Electric Overhead Installation $34,333 f 48% <br /> Construction-Electric Overhead Removals $20,154 28% <br /> Design, Construction [Nana ement, Inspection $11,136 15% <br /> Contingency___ _ _ $6,577 9% <br /> Subtotal (Engineer's Estimate): $72:200 <br /> Funds are budgeted and available for this project in the Line Rebuilds Account No. 6130000-470603. <br /> Prepared by: S':ephen H. Badgett, Public Utilities Deputy General Manager/Energy Delivery <br /> Approved by: David H. Wright, Public Utilities General Manager <br /> Approved by. Belinda J. Graham, Assistant City Manager <br /> Approved as to form: Gregory P. Priamos, City Attorney <br /> Certifies availability of funds: <br /> Reik A err <br /> Public Utilities Assistant General Manager <br /> Finance/Administration <br /> Attachment: Project Site Map <br />
The URL can be used to link to this page
Your browser does not support the video tag.