Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2010 BPU
>
11-05-10
>
11-05-10 BPU RPT 03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2015 4:23:57 PM
Creation date
10/9/2015 4:23:55 PM
Metadata
Fields
Template:
General
Department
Public Utilities
General - Type
Misc
Document Relationships
11-05-2010 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2010 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
• . r tr.. r r <br /> - RIVERSIDE PUBLIC UTILITIES <br /> Board Memorandum ► : , l r e E <br /> BOARD OF PUBLIC UTILITIES DATE: November 5, 2010 <br /> ITEM NO: 3 <br /> SUBJECT: GO 165 REHABILITATION OF VAULT V2909 -WORK ORDER NO. 0905365 <br /> ISSUE: <br /> Board of Public Utilities approval is requested for Work Order No. 0905365. <br /> RECOMMENDATION. <br /> That the Board of Public Utilities approve the estimated capital expenditure of$125,000 for the rehabilitation <br /> of Vault V2909. <br /> BACKGROUND: <br /> The California Public Utilities Commission mandated General Order (GO) 165 as a standard of care for <br /> inspection of investor owned utility electric systems in 1997. Riverside Public Utilities (RPU) adopted this <br /> standard of care for its own electric system. Following GO 165 inspections, it was determined that Vault <br /> V2909 has major physical deficiencies and is in need of rehabilitation, Engineering is complete for the <br /> replacement of the vault walls, ceiling and the replacement of conductors. <br /> RPU staff performed engineering design and either RPU staff or contractors from the Contractor's Panel for <br /> Energy Delivery Work will perform Construction. <br /> FISCAL IMPACT: <br /> The total estimated cost for Work Order No. 0905365 is$125,000. Funds are budgeted and available for this <br /> project in the Line Rebuilds Account No. 6130000470603. <br /> Prepared by: Stephen H. Badgett, Public Utilities Deputy Director/Energy Delivery <br /> Approved by: David H. Wright, Public Utilities General Manager <br /> Approved by: Belinda J. Graham, Assistant City Manager <br /> Approved as to form. Gregory P. Priamos, City Attorney <br /> Certifies availability of funds: <br /> Reiko Kerr <br /> Public Utilities Assistant General Manager <br /> Finance/Administration <br />
The URL can be used to link to this page
Your browser does not support the video tag.