Laserfiche WebLink
W A 1 - 9 f ii = R r, + - l o f <br /> 3W& RIVERSIDE PUBLIC UTILITIES <br /> Board Memorandum <br /> PU81. IC U T1 ? 11' 1 F � <br /> BOARD OF PUBLIC UTILITIES DATE: August 20, 2010 <br /> ITEM NO: 18 <br /> SUBJECT: WATER HIGHLIGHTS —July 2010 <br /> Domestic water production for the month of July 2010,totaled 7,735 acre feet(2,520 million gallons),with <br /> the following resource mix: <br /> • Bunker Hill Basin: 67% <br /> • Riverside Basin: 33% <br /> • Purchased Water: 0% <br /> Peak water usage for the month of July 2010, was 90.6 million gallons per day (mgd) and occurred on July <br /> 19th. <br /> Under the Cooperative Agreement for Water Production and Conveyance with Western Municipal Water <br /> District,405.9 of potable water and 120.9 AF of irrigation water were delivered to WMWD. 41.2 AF were <br /> sold to the Home Gardens Community Services District. <br /> The significant event for the water system in July 2010 was the Gage pipeline shutdown on July 25`b for one <br /> day of major repairs. <br /> Current Period Last Mouth July 2009 <br /> Peak Consumption: 90.6 mgd 81.9 mgd 98.0 mgd <br /> Average Consumption: 80.1 mgd 76.0 mgd 89.9 mgd <br /> Minimum Consumption: 72.3 mgd 67.1 mgd 79.2 mgd <br /> Total Consumption: 7,735 AF 7,068 AF 8,148 AF <br /> Peak Temperature: 105 94 103 <br /> Average Temperature: 89 85 95 <br /> Minimum Temperature: 76 73 81 <br />