Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2010 BPU
>
07-16-10
>
07-16-10 BPU RPT 05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2015 9:08:05 AM
Creation date
10/9/2015 9:08:00 AM
Metadata
Fields
Template:
General
Department
Public Utilities
General - Type
Misc
Document Relationships
07-16-2010 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2010 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
W A T E R E N <br /> E3W& RIVERSIDE PUBLIC UTILITIES <br /> Board Memorandum <br /> P U B L I C U T I L I T I E S <br /> BOARD OF PUBLIC UTILITIES DATE: July 16, 2010 <br /> ITEM NO: 5 <br /> SUBJECT: CABLE REPLACEMENT FOR VICTORIA HEIGHTS APARTMENTS <br /> WORK ORDER NO. 1022070 <br /> ISSUE: <br /> Board of Public Utilities approval is requested for Work Order No. 1022070. <br /> RECOMMENDATION: <br /> That the Board of Public Utilities approve the estimated capital expenditure of$251,000 to replace out of <br /> date and deteriorating underground electrical equipment and structures, located at Victoria Heights <br /> Apartments along Lincoln Avenue and Grace Street. <br /> BACKGROUND: <br /> The underground electric system at Victoria Heights Apartments, along Lincoln Avenue and Grace <br /> Street, is over 42 years old and needs to be replaced. As part of our HMPE cable replacement program <br /> and to prevent unplanned outages this project will replace a total of three transformers as well as <br /> approximately 1,286 feet of obsolete 15 kV High Molecular Poly Ethylene (HMPE) insulation cable with <br /> our current standard 15 kV underground cables and install new conduit. <br /> The electrical engineering will be performed by Riverside Public Utilities (RPU). All civil work including <br /> trenching, conduits and other infrastructure work will be performed by a contractor through the <br /> competitive bid process. Electrical work will be performed by RPU field forces. <br /> FISCAL IMPACT: <br /> The capital expenditure for the project is estimated to be $251,000 and includes all construction, <br /> contingencies, construction management, inspection and design, as summarized in the following table: <br /> % Of <br /> Total <br /> Design, Construction Management, Inspection $49,665.49 19.79% <br /> Construction-RPU Electrical Work & Materials $19,108.08 07.61% <br /> Contingency 15% $10,316.08 04.11% <br /> Construction-Electric Conduit & Structures $171,910.35 68.49% <br /> Subtotal: $251,000.00 1 100 % <br /> Funds are budgeted and available for this project in the Cable Replacement Account No. 6130000- <br /> 470635. <br />
The URL can be used to link to this page
Your browser does not support the video tag.