Laserfiche WebLink
W A T E R E N <br /> E3W& RIVERSIDE PUBLIC UTILITIES <br /> Board Memorandum <br /> P U B L I C U T I L I T I E S <br /> BOARD OF PUBLIC UTILITIES DATE: July 16, 2010 <br /> ITEM NO: 5 <br /> SUBJECT: CABLE REPLACEMENT FOR VICTORIA HEIGHTS APARTMENTS <br /> WORK ORDER NO. 1022070 <br /> ISSUE: <br /> Board of Public Utilities approval is requested for Work Order No. 1022070. <br /> RECOMMENDATION: <br /> That the Board of Public Utilities approve the estimated capital expenditure of$251,000 to replace out of <br /> date and deteriorating underground electrical equipment and structures, located at Victoria Heights <br /> Apartments along Lincoln Avenue and Grace Street. <br /> BACKGROUND: <br /> The underground electric system at Victoria Heights Apartments, along Lincoln Avenue and Grace <br /> Street, is over 42 years old and needs to be replaced. As part of our HMPE cable replacement program <br /> and to prevent unplanned outages this project will replace a total of three transformers as well as <br /> approximately 1,286 feet of obsolete 15 kV High Molecular Poly Ethylene (HMPE) insulation cable with <br /> our current standard 15 kV underground cables and install new conduit. <br /> The electrical engineering will be performed by Riverside Public Utilities (RPU). All civil work including <br /> trenching, conduits and other infrastructure work will be performed by a contractor through the <br /> competitive bid process. Electrical work will be performed by RPU field forces. <br /> FISCAL IMPACT: <br /> The capital expenditure for the project is estimated to be $251,000 and includes all construction, <br /> contingencies, construction management, inspection and design, as summarized in the following table: <br /> % Of <br /> Total <br /> Design, Construction Management, Inspection $49,665.49 19.79% <br /> Construction-RPU Electrical Work & Materials $19,108.08 07.61% <br /> Contingency 15% $10,316.08 04.11% <br /> Construction-Electric Conduit & Structures $171,910.35 68.49% <br /> Subtotal: $251,000.00 1 100 % <br /> Funds are budgeted and available for this project in the Cable Replacement Account No. 6130000- <br /> 470635. <br />