Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2010 BPU
>
06-04-10
>
06-04-10 BPU RPT 04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2015 11:46:34 AM
Creation date
10/8/2015 11:46:30 AM
Metadata
Fields
Template:
General
Department
Public Utilities
General - Type
Misc
Document Relationships
06-04-2010 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2010 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
W A T E R E H E R U Y L I F E <br /> RIVERSIDE PUBLIC UTILITIES <br /> Board Memorandum <br /> P U B L I C U T I L I T I E S <br /> BOARD OF PUBLIC UTILITIES DATE: June 4, 2010 <br /> ITEM NO: 4 <br /> SUBJECT: CIRCUIT 1533 FEEDER LOAD RELIEF PROJECT - WORK ORDER NO. 100003-28 <br /> ISSUE: <br /> Board of Public Utilities' approval is requested for Work Order No. 100003-28. <br /> RECOMMENDATION: <br /> That the Board of Public Utilities approve the estimated capital expenditure of$214,000 to install primary <br /> cable and underground structures on Overlook Parkway between Via Montecito and Magnon Court. <br /> BACKGROUND: <br /> Limitation of available back-up capacity, along with the distance from the Freeman and Orangecrest <br /> Substations servicing this area, requires that a new feeder circuit be installed from Orangecrest <br /> Substation along Overlook Parkway. This is the preferred route for its ease of construction, magnitude of <br /> load relief, and slightly less cost from other alternatives. The work consists of 45 feet of trenching along <br /> Overlook Parkway, installation of conduits, approximately 4487 feet of new primary underground cable <br /> and one pad mounted switch. <br /> Engineering was performed by Energy Delivery staff. All civil work including trenching, conduits, vaults <br /> and other infrastructure work will be performed by a contractor through the competitive bid process. <br /> Electrical work will be performed by Energy Delivery field forces. <br /> FISCAL IMPACT: <br /> The capital expenditure for the project is estimated to be $214,000, which includes all construction, <br /> contingencies, construction management, inspection and design, as summarized in the following table: <br /> % Of <br /> Total <br /> Construction-Electric Conduit & Structures $20,000.00 9% <br /> Construction-RPU Electrical Work $180,000.00 84% <br /> Design, Construction Management, Inspection $10,000.00 5% <br /> Contingency $4,000.00 2% <br /> Total: $214,000.00 100 % <br /> Funds are budgeted and available for this project in the Major Feeders Account No. 6130000-470633. <br /> Prepared by: Stephen H. Badgett, Public Utilities Deputy General Manager/Energy Delivery <br /> Approved by: David H. Wright, Public Utilities General Manager <br /> Approved by: Belinda J. Graham, Assistant City Manager <br /> Approved as to form: Gregory P. Priamos, City Attorney <br />
The URL can be used to link to this page
Your browser does not support the video tag.