Laserfiche WebLink
W A T E R I E N E R 5 Y , L I F E <br /> RIVERSIDE PUBLIC UTILITIES <br /> Board Memorandum <br /> P U B L I C U T I L I T I E S <br /> BOARD OF PUBLIC UTILITIES DATE: April 16, 2010 <br /> ITEM NO: 17 <br /> SUBJECT: WATER HIGHLIGHTS — March 2010 <br /> Domestic water production for the month of March 2010, totaled 4,374 acre feet (1 ,425 million <br /> gallons), with the following resource mix: <br /> • Bunker Hill Basin: 49% <br /> • Riverside Basin: 51% <br /> • Purchased Water: 0% <br /> Peak water usage for the month of March 2010, was 59.5 million gallons per day (mgd) and <br /> occurred on March 29th. <br /> Under the Cooperative Agreement for Water Production and Conveyance with Western Municipal <br /> Water District, 308.4 AF of potable water and 16.4 AF of irrigation water were delivered to WMWD. <br /> 25.4 AF were sold to the Home Gardens Community Services District. <br /> There were no significant events for the water system in March 2010. <br /> Current Period Last Month March 2009 <br /> Peak Consumption: 59.5 mgd 43.3 mgd 66.0 mgd <br /> Average Consumption: 44.6 mgd 34.7 mgd 53.2 mgd <br /> Minimum Consumption: 29.8 mgd 28.8 mgd 43.4 mgd <br /> Total Consumption: 4,374 AF 3,057 AF 5,092 AF <br /> Peak Temperature: 86 82 87 <br /> Average Temperature: 72 66 71 <br /> Minimum Temperature: 59 56 59 <br />