Laserfiche WebLink
W A T E R I E N E R G Y ' 1. [ K E <br /> RIVERSIDE PUBLIC UTILITIES <br /> • Board Memorandum <br /> P U B L I C U T I L I T I E S <br /> BOARD OF PUBLIC UTILITIES DATE: March 19, 2010 <br /> ITEM NO: 18 <br /> SUBJECT: WATER HIGHLIGHTS — February 2010 <br /> Domestic water production for the month of February 2010,totaled 3,057 acre feet(996 million gallons),with <br /> the following resource mix: <br /> • Bunker Hill Basin: 42% <br /> • Riverside Basin: 58% <br /> • Purchased Water: 0% <br /> Peak water usage for the month of February 2010,was 43.3 million gallons per day (mgd) and occurred on <br /> February 17th. <br /> Under the Cooperative Agreement for Water Production and Conveyance with Western Municipal Water <br /> District,367.5 AF of potable water and no deliveries of irrigation water were delivered to WMWD. 18.2 AF <br /> were sold to the Home Gardens Community Services District. <br /> There were no significant events for the water system in February 2010. <br /> Current Period Last Month February 2009 <br /> Peak Consumption: 43.3 mgd 56.4 mgd 60.2 mgd <br /> Average Consumption: 34.7 mgd 40.3 mgd 40.4 mgd <br /> Minimum Consumption: 28.8 mgd 28.5 mgd 34.2 mgd <br /> Total Consumption: 3,057 AF 3,814 AF 3,513 AF <br /> Peak Temperature: 82 81 84 <br /> Average Temperature: 66 68 66 <br /> Minimum Temperature: 56 46 52 <br />