Home
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2010 BPU
>
03-19-10
>
03-19-10 BPU RPT 06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2015 12:58:49 PM
Creation date
10/7/2015 12:58:45 PM
Metadata
Fields
Template:
General
Department
Public Utilities
General - Type
Misc
Document Relationships
03-19-2010 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2010 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
RIVERSIDE PUBLIC UTILITIES <br /> Board Memorandum <br /> BOARD OF PUBLIC UTILITIES DATE: March 19, 2010 <br /> ITEM NO: 6 <br /> SUBJECT: CABLE INSTALLATION FOR CIRCJIT 1533 FEEDER LOAD RELIEF PROJECT <br /> WORK ORDER NO. 1024754 <br /> ISSUE: <br /> Board of Public Utilities approval is requested for Work Order 1020754 in the amount of$370,466.94. <br /> RECOMMENDATION: <br /> That the Board of Public Utilities approve the estimated capital expenditure of $370,466.94 to install a <br /> new underground feeder from the Orangecrest Substation up Alessandro Boulevard and along Overlook <br /> Parkway through existing substructures where it will tie into Circuit 1551. <br /> BACKGROUND: <br /> Due to excessive loading on Circuit 1551, the availability to offer relief to neighboring circuits during <br /> abnormal operating contingencies is eliminated. This r ew feeder circuit will provide relief to Circuit 1551 <br /> and will provide spare capacity to be used during contingencies. This project is consistent with Electric <br /> System Master Plan, by creating a new feeder to relievo Circuit 1551. <br /> The capital expenditure for the project is estimated to be $370,466.94 and includes all construction, <br /> contingencies, construction management, inspection and design. Construction consists of installing 12 <br /> kV cables and equipment in existing infrastructure with no impacts to existing streets or right-of-way. <br /> Engineering was performed by Riverside Public Utilities (RPU) and electrical work will be performed by <br /> RPU field forces. <br /> FISCAL IMPACT: <br /> The total project cost is estimated at $370,466.94. Funds are budgeted and available for this project in <br /> the Major Feeders Account No. 6130000-474633. <br /> Prepared by: Stephen H. Badgett, Public Utilities Deputy General Manager/Energy Delivery <br /> Approved by: David H. Wright, Public Utilities General Manager <br /> Approved by: Belinda J. Graham, Assistant Cite Manager <br /> Approved as to form: Gregory P. Priamos, City Attorney <br /> Certifies availability of funds: <br /> Reik A. Kerr <br /> Public Utilities Assistant General Manager <br /> Finance/Customer Services <br /> Attachment: Project Site Map <br />
The URL can be used to link to this page
Your browser does not support the video tag.