Laserfiche WebLink
A A I t H t R 1 N i. t 1 1 1 1 <br /> RIVERSIDE PUBLIC UTILITIES <br /> Board Memorandum <br /> P U 13 1 1 C 11 T I L I T I E S <br /> BOARD OF PUBLIC UTILITIES DATE: February 19, 2010 <br /> ITEM NO: 20 <br /> SUBJECT: WATER HIGHLIGHTS —January 2010 <br /> Domestic water production for the month of January 2010, totaled 3,814 acre feet (1,243 million gallons), <br /> with the following resource mix: <br /> • Bunker Hill Basin: 55% <br /> • Riverside Basin: 45% <br /> Purchased Water: 0% <br /> Peak water usage for the month of January 2010, was 56.4 million gallons per day (mgd) and occurred on <br /> January 2nd. <br /> Under the Cooperative Agreement for Water Production and Conveyance with Western Municipal Water <br /> District,283.5 AF of potable water and no deliveries of irrigation water were delivered to WMWD. 22.7 AF <br /> were sold to the Home Gardens Community Services District. <br /> There were no significant events for the water system in January 2010. <br /> Current Period Last Mouth December 2408 <br /> Peak Consumption: 56.4 mgd 61.7 mgd 62.9 mgd <br /> Average Consumption: 40.3 mgd 41.8 mgd 51.4 mgd <br /> Minimum Consumption: 28.5 mgd 32.2 mgd 37.7 mgd <br /> Total Consumption: 3,814 AF 4,066 AF 4,877 AF <br /> Peak Temperature: 81 80 85 <br /> Average Temperature: 68 64 72 <br /> Minimum Temperature: 46 50 57 <br />