W A T E R I E N E R G Y I l I E E <br /> RIVERSIDE PUBLIC UTILITIES <br /> =J <br /> WI& <br /> PUB L I C U T 1. 1 , 1 1- 5 Board Memorandum <br /> BOARD OF PUBLIC UTILITIES DATE: January 15, 2010 <br /> DIRECTOR'S REPORT <br /> ITEM NO: 13 <br /> SUBJECT: MONTHLY POWER SUPPLY REPORT— November 2009 <br /> POWER USAGE <br /> Total energy requirements during November 2009 were 198,911 MWh, of which 157,932 MWh were attributed to <br /> retail customer load and the remainder being sales to wholesale parties and system losses. The retail load for <br /> November 2009 was 3.9% lower than the retail energy load in November 2008. The actual peak system demand <br /> was 317 MW, compared to actual peak system demand of 324 MW last year. Sales to wholesale parties, losses <br /> and energy returns represented 25.9% of the total energy requirement as compared to 25.5% for last year. Sales <br /> to wholesale parties accounted for 11,283 MWh, which included 3,213 MWh in sales to the ISO. Energy returns <br /> were 24,150 MWh and 5,545 MWh were attributed to losses 3.92%. Green power supplied approximately 23.7% of <br /> our retail energy requirements. <br /> The City's generation resources were available during the month as follows: <br /> UNIT OPERATION <br /> IPP: IPP units 1 and 2 operated at 85% capacity factor for the month. <br /> PVNGS: Palo Verde units 1 and 3 operated at 70% capacity factor for the month. Unit 2 is on scheduled <br /> refueling outage from 10/5/09— 12/02/09. <br /> SONGS: SONGS unit 3 operated at 100% capacity factor for the month. Unit 2 is on scheduled outage for <br /> generator replacement through 1/27/10. <br /> Deseret: The Bonanza unit operated at 83% capacity factor for the month due to unavailable transmission <br /> capacity, bag house issues, loss of mill. <br /> Hunter unit 2 operated at 96% capacity factor for the month due to opacity, SO3 skid failure, <br /> transmission constraints, valve test, mill maintenance, fuel control problems, and loss of mill. <br /> Hoover: Hoover operated at 66% availability for the month due to low water elevation in Lake Mead and <br /> various scheduled unit maintenances. <br /> Springs: Springs units 1, 2, 3 and 4 availability was 100% for the month. <br /> RERC: RERC Units 1 and 2 availability was 100% for the month. <br /> Salton Sea: The Salton Sea units operated at 99% capacity factor for the month. <br /> TRANSMISSION: <br /> Pacific DC: The line was de-rated due to repairs to damage caused by the Station Fire through April 2010. <br /> Attached are the charts of daily peaks and the graphical comparison of demand and energy supplied from each <br /> resource for the months of November 2009 and November 2008. <br /> AA <br /> Attachments <br /> cc: Bradley J. Hudson, City Manager <br />