Laserfiche WebLink
WA'rER I ENERGY LIFE <br /> RIVERSIDE PUBLIC UTILITIES <br /> Board Memorandum <br /> P U B L I C U T I L I T I E S <br /> BOARD OF PUBLIC UTILITIES DATE: January 15, 2010 <br /> ITEM NO: 6 <br /> SUBJECT: LINDEN 72-INCH METER AND VAULT <br /> ISSUE: <br /> Consideration of a capital expenditure of$115,000 for the installation of the Linden 72-inch meter vault. <br /> RECOMMENDATION: <br /> That the Board of Public Utilities approve the capital expenditure of$115,000 for Work Order No. 1009036, <br /> which is for the procurement and installation of the Linden 72-inch meter vault. <br /> BACKGROUND: <br /> Water Operations and Field Forces purchased and installed a temporary water meter for the 72-inch pipeline <br /> near Linden Booster Station. Located at the confluence of Riverside Public Utilities' (RPU)water supply,this <br /> meter was needed to help calibrate the water model. It has been determined that there is value in making <br /> this meter permanent to assist with the ongoing monitoring of RPU's production meters and the continuing <br /> calibration of the water model. This can be done by housing the meter in a nine foot by twelve foot vault. <br /> Due to the size and the weight of the vault needed to house the meter, portions of this work will be <br /> contracted out. City forces will install the meter on the pipeline. Excavation for the vault - which is <br /> approximately 20 feet deep, and construction of the vault foundation, and backfill around the vault will be <br /> performed by a contractor, to be procured through the Water Utility Contractor's Panel. The contractor and <br /> vault vendor will set the vault. Instrumentation and connection to the City's SCADA system will be performed <br /> by City staff. <br /> The estimated project cost is $115,000. <br /> FISCAL IMPACT: <br /> The total project cost is estimated at $115,000, and detailed in the table below: <br /> Item Cost <br /> Purchase vault and riser from Jensen Precast $24,660 <br /> Trench shoring —estimated $15,000 <br /> City Forces —estimated $36,000 <br /> Construction Contract (Contractor's Panel) - estimated $35,000 <br /> Contingencies $4,340 <br /> Total $115,000 <br /> Funds are budgeted and available in Public Utilities' Water Facility Rehabilitation Account No. 6230000- <br /> 470803. <br />