Laserfiche WebLink
W A I= R h N h R L Y I. I F F <br />RIVERSIDE PUBLIC UTILITIES <br />Board Memorandum <br />PUBLIC UTILITIES <br />BOARD OF PUBLIC UTILITIES DATE: OCTOBER 16, 2015 <br />ITEM NO: 8 <br />File ID — 15 -3273 — D <br />SUBJECT: CONSTRUCTION OF THE LARCHWOOD PLACE WATER MAIN REPLACEMENT <br />PROJECT— WORK ORDER NO. 1602941 FOR $895,000 <br />ISSUE: <br />The issue for Board of Public Utilities consideration is to approve a capital expenditure in the amount of <br />$895,000 for Work Order No. 1602941 to construct the Larchwood Place Water Main Replacement <br />Project. <br />RECOMMENDATION: <br />That the Board of Public Utilities approve a capital expenditure of $895,000 for Work Order No. <br />1602941 which includes all design, construction, paving, contract administration, inspection and <br />construction contingency costs for the Larchwood Place Water Main Replacement Project. <br />BACKGROUND: <br />The construction of the Larchwood Place Water Main Replacement Project is part of Riverside Public <br />Utilities' (RPU) ongoing water main replacement program to replace old and high priority leaky mains. <br />The project area consists of existing 4 -inch cast iron water mains that were installed in 1929. Based on <br />their leak history, age and size, these water pipelines have been identified as high priorities for <br />replacement to increase system reliability and increase fire flow. <br />This work was originally scheduled to be completed in the next Fiscal Year. However, in order to <br />minimize disruptions to the customers in this area, it was reprioritized to coincide with pavement work <br />along Larchwood Place and Ramona Drive required as part of the Woods Streets Streetlight <br />Replacement, Phase I Project. For this reason, this project was not included in the "Planned Routine <br />Projects over $500,000 for Electric and Water Capital Projects for Fiscal Year 2015/16" report received <br />by the Board on September 4, 2015. <br />The work will generally entail the construction of approximately 3,000 linear feet of 8 -inch ductile iron <br />pipe, 8 fire hydrants, 55 service tie -overs and 6 system connections along with all necessary fittings <br />and appurtenances. <br />The work identified will be constructed by the Water Division's field forces. Other than routine service <br />tie - overs, this project is not expected to disrupt service to RPU water customers. <br />Once the new water pipelines are installed, RPU will be responsible for standard trench repaving per <br />the Public Works Department (PW) standards. Staff will solicit paving bids for resurfacing the trench <br />area from RPU's Paving Contractor Panel. A budgetary estimate for the paving work has been <br />included in this authorization. <br />