Home
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2011 BPU
>
12-02-11
>
12-02-11 BPU RPT 07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2015 3:53:16 PM
Creation date
10/5/2015 3:53:10 PM
Metadata
Fields
Template:
General
Department
Public Utilities
General - Type
Misc
Document Relationships
12-02-2011 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2011 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
RIVERSIDE PUBLIC UTILITIES <br /> Board Memorandum <br /> F U S L I C U T I L 1 T I E 5 <br /> BOARD OF PUBLIC UTILITIES DATE: December 2, 2011 <br /> ITEM NO: 7 <br /> SUBJECT: CONSTRUCTION OF THE SIERRA VISTA AVENUE AND PEACOCK LANE 8-INCH <br /> WATER DISTRIBUTION MAIN REPLACEMENT PROJECT — WORK ORDER <br /> NO.1121 254 <br /> ISSUE: <br /> That the Board of Public Utilities consider approval of the capital expenditure in the amount of <br /> $1,300,000 to construct the Sierra Vista Avenue and Peacock Lane 8-Inch Water Distribution Main <br /> Replacement Project. <br /> RECOMMENDATION: <br /> That the Board of Public Utilities approve the capital expenditure of $1,300,000 for Work Order No. <br /> 1121254 which includes all design, construction, paving, contract administration and construction <br /> contingency costs for the Sierra Vista Avenue and Peacock Lane 8-Inch Water Distribution Main <br /> Replacement Project. <br /> BACKGROUND: <br /> The construction of the Sierra Vista Avenue and Peacock Lane 8-Inch Water Distribution Main <br /> Replacement Project is part of the on-going water main replacement program to replace old and high <br /> priority leaky mains. The project area consists of a combination of existing 2-inch, 4-inch and 10-inch <br /> steel and asbestos cement water mains that were installed more than 50 years ago. The work will entail <br /> the construction of approximately 3,900 linear feet of eight-inch ductile iron pipe, 12 fire hydrants, 66 <br /> service tie-overs and 12 system connections. The work identified will be constructed by the Water <br /> Division's field forces. <br /> Once the new water pipelines are installed, Riverside Public Utilities (RPU) will be responsible for <br /> standard trench repaving per the Public Works standard. Near the end of pipeline construction, staff will <br /> solicit paving bids for paving the trench area through the Public Utilities Paving Contractor Panel. A <br /> budgetary estimate for the paving work has been included in this authorization. <br /> FISCAL IMPACT: <br /> The total capital expenditure for Work Order No. 1121254 is estimated to be $1,300,000 which includes <br /> all design, construction, paving, contract administration and construction contingency costs necessary to <br /> perform the work, as summarized in the following table: <br />
The URL can be used to link to this page
Your browser does not support the video tag.