RIVERSIDE PUBLIC UTILITIES <br /> Board Memorandum <br /> P U B L I C U T I L I T I E S <br /> BOARD OF PUBLIC UTILITIES DATE: November 18, 2011 <br /> ITEM NO: 6 <br /> SUBJECT: MOCKINGBIRD BOOSTER STATION ELECTRICAL UPGRADES-WORK ORDER NO. <br /> 1115539 <br /> ISSUE: <br /> That the Board of Public Utilities consider approval of the capital expenditure of$194,000 for Work Order No. <br /> 1115539 for the upgrade of the electrical upgrades at the Mockingbird Booster Station. <br /> RECOMMENDATION: <br /> That the Board of Public Utilities approve the expenditure of$194,000 for Work Order No. 1115539 for the <br /> electrical upgrades at the Mockingbird Booster Station. <br /> BACKGROUND: <br /> The Mockingbird Booster Station pumps water from the Gravity pressure zone to the 1,200 Van Buren <br /> pressure zone,as well as to the Mockingbird Canyon interconnection (Mockingbird)with Western Municipal <br /> Water District(WMWD). The existing booster station has four(4) pumps and motors consisting of three (3) <br /> 200 and one (1) 75 horsepower pumps. <br /> Riverside Public Utilities (RPU) has an agreement to wheel as much as 10 cubic feet per second (cfs) to <br /> W MW D at Mockingbird. However, during the summer months, RPU is only able to deliver approximately <br /> seven (7) cfs due to limitations at the Booster Station. <br /> In order to increase the booster station's pumping capacity the electrical service and switchgear need to be <br /> increased to accommodate an additional 200 horsepower pump. Once this is complete, the 75 horsepower <br /> will be replaced with 200 horsepower motor and will increase flows from 9,400 gallon per minute (gpm) to <br /> 11,200 gpm, which is an increase of approximately four(4) cfs. The cost to upgrade the electrical service is <br /> $13,586. <br /> This project also includes for the installation and purchase of a conduit, transformer pad, switchgear and <br /> bussed gutter. Staff is in the process of soliciting bids from contractors from RPU Electric's Contractor's <br /> Panel to complete the installation of the new service,switchgear and bussed gutter. The cost estimate for the <br /> installation work is $120,000. <br /> FISCAL IMPACT: <br /> The total project cost is estimated at $194,000. Funds are budgeted and available in the Public Utilities' <br /> Water Fund, Facility Rehab Account No.6230 000-47 0803 and are proposed to be allocated as shown on the <br /> table below. <br />