W A T E R E N E k G V L ! f. <br /> RIVERSIDE PUBLIC UTILITIES <br /> P U B L I C U T I L IT I E S Board Memorandum <br /> BOARD OF PUBLIC UTILITIES DATE: October 7, 2011 <br /> ITEM NO: 7 <br /> SUBJECT: FIVE-POINTS STREET IMPROVEMENT PROJECT — INCREASE OF FUNDS FOR <br /> WORK ORDER NO. 070015-04 <br /> ISSUE: <br /> That the Board of Public Utilities consider approval of an increase in the capital expenditure for Work <br /> Order No. 070015-04 and the Change Order amount for Purchase order No. 113807 which exceeds <br /> 10% of the original purchase order amount. <br /> RECOMMENDATIONS: <br /> That the Board of Public Utilities: <br /> 1. Approve an increase of funds for Work Order No. 070015-04 from $328,245.14 to $503,347.37 <br /> and; <br /> 2. Approve Change order No. 2 to Purchase Order No. 113807 in the amount of $10,325.65 <br /> BACKGROUND: <br /> On September 17, 2010, the Board approved Work order No. 070015-04 in the amount of $328,245.14 <br /> for the installation and removal of electric facilities as part of the Five-Points Street Improvement Project. <br /> After construction began, several below grade structures were determined to be failing and were not <br /> going to meet the General Order 165 standard of care requirements, Additional design, trenching, <br /> conduits and structures were added to the scope of work to make the necessary repairs. The additional <br /> work was completed to prevent trenching and major excavation of the new street if the structures were to <br /> be replaced at a later date. The cost for the additional work was a total of $153,913 - $97,572 for the <br /> City contractor and $56,341 for the City field crews and material. <br /> The overhead and underground cabling installation for this project was issued to the Contractors' Panel. <br /> Bids were opened on December 23, 2010 and Hot Line Construction Inc., of San Jacinto, Califomia, was <br /> the lowest responsive bidder in the amount of $108,632.00. Purchase Order No.113807 was issued in <br /> this amount. Unrelated to the additional work for the failing underground facilities discussed above: <br /> Change Order No. 1, in the amount of$10,863.20 was issued on May 10, 2011 for retrenching of <br /> an existing pole, re-racking of underground cables in a vault, rerouting of conduits and sewer line <br /> repairs not shown on plans. <br /> Change Order No. 2, in the amount of $10,325.65 is requested for replacing one (1) additional <br /> pole and transferring and rerouting of exiting overhead lines to meet the ADA sidewalk <br /> requirements. <br /> Board authorization is required as the cumulative change order amount exceeds 10% of the original <br /> purchase order amount. No further change orders are anticipated as the work is nearly complete. <br />