Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2011 BPU
>
09-02-11
>
09-02-11 BPU RPT 05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2015 9:33:44 AM
Creation date
10/5/2015 9:26:59 AM
Metadata
Fields
Template:
General
Department
Public Utilities
General - Type
Misc
Document Relationships
09-02-2011 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2011 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
W A 1 t R E N E R G Y l I. 1 R F <br /> RIVERSIDE PUBLIC UTILITIES <br /> Board Memorandum <br /> P U B L I C U T I L I T I E S <br /> BOARD OF PUBLIC UTILITIES DATE: September 2, 2041 <br /> ITEM NO: 5 <br /> SUBJECT: REPLACEMENT OF 58 DETERIORATED BURIED TRANSFORMER ENCLOSURES AT <br /> VARIOUS LOCATIONS —WORK ORDER 1204228 <br /> ISSUE: <br /> Board of Public Utilities approval is requested for Work Order No.1204228, <br /> RECOMMENDATION: <br /> That the Board of Public Utilities approve the estimated capital expenditure of$481,400 for the replacement <br /> of 58 deteriorated buried transformer enclosures (BTEs) at various locations. <br /> BACKGROUND: <br /> The General Order(G.0.) 165 underground detailed inspection program has identified 58 BTE structures that <br /> are deteriorated and in need of replacement. The replacement cost of each structure is estimated at$8,300 <br /> and includes the replacement of the deteriorated plastic BTE sleeve with a new precast concrete structure. <br /> Each location will be upgraded to current standards at the time of the structure replacement, <br /> FISCAL IMPACT: <br /> The total estimated capital cost for Work Order No.1204228 is$481,400. Funds are budgeted and available <br /> for this project in the Account No. 6130000-470623 <br /> Prepared by: Stephen H. Badgett, Public Utilities Deputy Director <br /> Approved by: David H. Wright, Public Utilities General Manager <br /> Approved by: Belinda J. Graham, Assistant City Manager <br /> Approved as to form: Gregory P. Priamos, City Attorney <br /> Certifies availability of funds: <br /> Reiko . Kerr <br /> Public Utilities Assistant General Manager <br /> Fi n an celAd ministration <br />
The URL can be used to link to this page
Your browser does not support the video tag.