Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2011 BPU
>
08-05-11
>
08-05-11 BPU RPT 10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2015 4:08:44 PM
Creation date
10/2/2015 3:55:32 PM
Metadata
Fields
Template:
General
Department
Public Utilities
General - Type
Misc
Document Relationships
08-05-2011 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2011 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
WAFER Er4F A 6 L I % F <br /> L31109 RIVERSIDE PUBLIC UTILITIES <br /> Board Memorandum <br /> PUBLIC UTILITIES <br /> BOARD OF PUBLIC UTILITIES DATE: August 5, 2011 <br /> ITEM NO: 10 <br /> SUBJECT: WATER SERVICES RELOCATION PROJECT ON STRONG STREET <br /> ISSUE: <br /> That the Board of Public Utilities consider approval of the capital expenditure in the amount of$653,000 to <br /> relocate the water services along Strong Street between Orange Street and Rivera Street. <br /> RECOMMENDATION: <br /> That the Board of Public Utilities approve the capital expenditure of$653,000 for Work Order No. 1111815, <br /> which includes the construction and design costs for the Strong Street Water Service Relocation Project. <br /> BACKGROUND: <br /> This project is part of the Riverside Public Utilities (RPU) Department's ongoing water main replacement <br /> program to replace aging and undersized water mains. In particular, there is a history of leaks along the <br /> segments of pipeline to be replaced as part of this project. The work generally entails relocating <br /> approximately 86 water services currently connected to a 4-inch and 6-inch waterline installed in the 1940's to <br /> a 12-inch waterline installed in the 1970's.The older, smaller water main,which has experienced leaks in the <br /> past, would be abandoned upon completion of the water service relocations. The work identified will be <br /> constructed by the Water Division's field forces. <br /> Once the service relocations are complete, RPU will repair the trenches in accordance with Publics Works' <br /> trench paving restoration standard of 2011. A budgetary estimate for the paving work has been included in <br /> this authorization. The actual amount will be reported at a future date after the paving design and bids for the <br /> paving work are received from RPU's paving contractor's panel with a recommendation to award the project. <br /> FISCAL IMPACT: <br /> The total capital expenditure for Work Order No. '1111815 is estimated to be $653,000 which includes all <br /> design and construction costs necessary to perform the work, as summarized in the following table: <br /> Design/Survey/Potholing/CEQA $85,000 <br /> Construction $412,000 <br /> Paving $156,000 <br /> Work Order Total $653,000 <br /> Funds are budgeted and available in the Public Utilities' Water Main Replacement Account No. 6230000- <br /> 470707, <br />
The URL can be used to link to this page
Your browser does not support the video tag.