Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2011 BPU
>
06-03-11
>
06-03-11 BPU RPT 18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2015 9:52:42 AM
Creation date
10/2/2015 9:52:35 AM
Metadata
Fields
Template:
General
Department
Public Utilities
General - Type
Misc
Document Relationships
06-03-2011 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2011 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
W A I E R E N E R G v • i i } r' <br /> RIVERSIDE PUBLIC UTILITIES <br /> W& Board Memorandum <br /> PUBLIC UTILITIES <br /> BOARD OF PUBLIC UTILITIES DATE: June 3, 2011 <br /> DIRECTOR'S REPORT <br /> ITEM NO: 18 <br /> SUBJECT: MONTHLY POWER SUPPLY REPORT—April 2011 <br /> POWER USAGE <br /> Total load requirements during April 2011 were 192,341 MWh, of which 165,242 MWh were provided by <br /> our resources (including 783 MWh from RERC Unit 3 and 414 MWh from RERC Unit 4), and 27,099 <br /> MWh from purchases from the CAISO. The retail customer load for April 2011 (155,295 MWh) was 2.2% <br /> higher than the retail customer load in April 2010 (152,016 MWh). The actual peak system demand was <br /> 339 MW, compared to actual peak system demand of 285 MW last year. Energy returns were 5,451 <br /> MWh and 2,605 MWh were attributed to losses (2.90%). Green power supplied approximately 11.18% of <br /> our retail energy requirements. <br /> The City's generation resources were available during the month as follows: <br /> UNIT OPERATION <br /> IPP: 1PP units 1 and 2 operated at 49% capacity factor for the month. <br /> PVNGS: Palo Verde units 1, 2 and 3 operated at 70% capacity factor for the month. <br /> SONGS: SONGS unit 2 & 3 operated at 100% capacity factor respectively for the month. <br /> Hoover: 94% of RVSD's entitlement was met for the month. <br /> Clearwater; Clearwater's availability was 86% for the month. <br /> RERC: RERC Units 1 & 2 availability was 99%for the month. <br /> RERC Units 3 &4 are in the process of being commissioned and are in testing mode. <br /> Springs: Springs units 1, 2, 3 and 4 availability was 100%for the month. <br /> Salton Sea: The Salton Sea units operated at 51% capacity factor for the month. <br /> TRANSMISSION: <br /> Pacific DC: The South to North transmission line is currently derated to 975 MW (ETR 1013112012) <br /> and the North to South transmission line is operational at 2,990 MW. <br /> Attached are the charts of daily peaks and the graphical comparison of demand and energy supplied <br /> from each resource for the months of April 2010 and April 2011. <br /> AA <br /> Attachments <br /> cc: Bradley J. Hudson, City Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.