Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2011 BPU
>
05-06-11
>
05-06-11 BPU RPT 21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2015 4:15:04 PM
Creation date
10/1/2015 4:11:13 PM
Metadata
Fields
Template:
General
Department
Public Utilities
General - Type
Misc
Document Relationships
05-06-2011 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2011 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
N ,, i n r y <br /> RIVERSIDE PUBLIC UTILITIES <br /> pUaLtc urtLcrtE 5 Board Memorandum <br /> BOARD OF PUBLIC UTILITIES DATE: May 6, 2011 <br /> DIRECTOR'S REPORT <br /> ITEM NO: 21 <br /> SUBJECT: MONTHLY POWER SUPPLY REPORT—March 2011 <br /> POWER USAGE <br /> Total load requirements during March 2011 were 205,707 MWh, of which 199,376 MWh were provided <br /> by our resources (including 1,693 MWh from RERC Unit 3 and 1,273 MWh from RERC Unit 4), and <br /> 6,331 MWh from purchases from the CAISO. The retail customer load for March 2011 (146,102 MWh) <br /> was 3.7% lower than the retail customer load in March 2010 (151,754 MWh). The actual peak system <br /> demand was 331 MW, compared to actual peak system demand of 312 MW last year. Energy returns <br /> were 24,483 MWh and 3,286 MWh were attributed to fosses (3.07%). Green power supplied <br /> approximately 12.87% of our retail energy requirements. <br /> The City's generation resources were available during the month as follows: <br /> UNIT OPERATION <br /> IPP: IPP units 1 and 2 operated at 64% capacity factor for the month. <br /> PVNGS: Palo Verde units 1, 2 and 3 operated at 83% capacity factor for the month. <br /> SONGS: SONGS unit 2 & 3 operated at 100% capacity factor respectively for the month. <br /> Hoover: 105% of RVSD's entitlement was met for the month. <br /> Clearwater; Clearwater's availability was 85% for the month. <br /> RERC: RERC Units 1 & 2 availability was 91% for the month. <br /> RERC Units 3 & 4 are in the process of being commissioned and are in testing mode. <br /> Springs: Springs units 1, 2, 3 and 4 availability was 97% for the month. <br /> Salton Sea: The Salton Sea units operated at 53% capacity factor for the month. <br /> TRANSMISSION: <br /> Pacific DC: The South to North transmission line is currently derated to 975 MW (ETR 1013112012) <br /> and the North to South transmission line is operational at 2,990 MW. <br /> Attached are the charts of daily peaks and the graphical comparison of demand and energy supplied <br /> from each resource for the months of March 2010 and March 2011. <br /> AA <br /> Attachments <br /> cc: Bradley J. Hudson, City Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.