Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2011 BPU
>
05-06-11
>
05-06-11 BPU RPT 04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2015 4:12:47 PM
Creation date
10/1/2015 4:02:25 PM
Metadata
Fields
Template:
General
Department
Public Utilities
General - Type
Misc
Document Relationships
05-06-2011 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2011 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
W A f f R E N E it G T, L l €€ <br /> aw& RIVERSIDE PUBLIC UTILITIES <br /> Board Memorandum <br /> P U B L C U TI L r 1 I ES. <br /> BOARD OF PUBLIC UTILITIES DATE: May 6, 2011 <br /> ITEM NO: 4 <br /> SUBJECT: CIRCUIT 1300 LOAD RELIEF PROJECT-WORK ORDER NO. 1104086 <br /> ISSUE: <br /> Board of Public Utilities approval is requested for Work❑rder No. 1104085. <br /> RECOMMENDATION: <br /> That the Board of Public Utilities approve the estimated capital expenditure of $80,000 for the Circuit <br /> 1300 Load Relief Project to replace cable and install overhead devices on First Street, between Orange <br /> and Mulberry Streets. <br /> BACKGROUND: <br /> This load relief project for Circuit 1300 will require the replacement of cable and the installation of <br /> switching equipment to relieve possible overload conditions for summer 2011. The proposed project <br /> includes work on First Street, between Orange and Mulberry Streets (see Attachment 1). The proposed <br /> project involves the replacement of 1200 feet of overhead cable, and the installation of two (2) overhead, <br /> pole mounted devices. <br /> FISCAL IMPACT: <br /> The total estimated cost for Work Order No.1104086 is $80,000. Funds are budgeted and available for <br /> this project in the Line Rebuilds Account No. 6130000-470603. <br /> Prepared by: Stephen H. Badgett, Public Utilities Deputy General Manager/Energy Delivery <br /> Approved by: David H. Wright, Public Utilities General Manager <br /> Approved by: Belinda J. Graham, Assistant City Manager <br /> Approved as to form: Gregory P. Priamos, City Attorney <br /> Certifies availability of funds: <br /> Reiko A. err <br /> Public Utilities Assistant General Manager <br /> Finance/Administration <br /> Attachment: <br /> 1. Project Site Map <br />
The URL can be used to link to this page
Your browser does not support the video tag.