Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2011 BPU
>
04-01-11
>
04-04-11 BPU RPT 04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2015 3:05:38 PM
Creation date
10/1/2015 2:57:53 PM
Metadata
Fields
Template:
General
Department
Public Utilities
General - Type
Misc
Document Relationships
04-01-2011 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2011 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
W A I F 12 F IJ F a C Y I ! <br /> RIVERSIDE PUBLIC UTILITIES <br /> Board Memorandum <br /> P U 8 L I C U T I L I T [ E S <br /> BOARD OF PUBLIC UTILITIES DATE: April 1, 2011 <br /> ITEM NO: 4 <br /> SUBJECT: CONSTRUCTION OF THE CAROB WAY 8-INCH WATER DISTRIBUTION MAIN <br /> REPLACEMENT PROJECT <br /> ISSUE: <br /> That the Board of Public Utilities consider approval of the capital expenditure in the amount of$344,500 to <br /> construct the Carob Way B-Inch Water Distribution Main Replacement Project. <br /> RECOMMENDATION: <br /> That the Board of Public Utilities approve the capital expenditure of$344,500 for Work Order No. 1111734, <br /> which includes all design, construction, and construction contingency costs for the Carob Way 8-Inch Water <br /> Distribution Main Replacement Project. <br /> BACKGROUND: <br /> The construction of the Carob Way 8-Inch Water Distribution Main Replacement Project is part of the on- <br /> going water main replacement program. Public Works will be rehabilitating and repaving the street and has <br /> requested that Public Utilities do the necessary pipeline replacement to avoid digging in the newly paved <br /> street should another leak occur, The work will generally entail the construction of approximately 800 linear <br /> feet of eight-inch ductile iron pipe,one fire hydrant, and reconnect to six existing water services within Carob <br /> Way as shown on the attached project site map. The work identified will be constructed by the Water <br /> Division's field forces. <br /> Once the new water pipelines are installed, Riverside Public Utilities(RPU)will be responsible for standard <br /> trench repaving per the Public Works standard. Near the end of pipeline construction staff will solicit paving <br /> bids for base paving the trench area. Public Works will follow with a contract to rehab and pave the entire <br /> street. A budgetary estimate for the paving work has been included in this authorization. <br /> FISCAL IMPACT: <br /> The total capital expenditure for Work Order No. 1111734 is estimated to be $344,500 which includes all <br /> design, construction, and construction contingency costs necessary to perform the work, as summarized in <br /> the following table: <br /> Design/Survey $12,000 <br /> Construction $200,000 <br /> Paving $95,000 <br /> Construction Contingency $29,500 <br /> Contract Man agementllnspection $8,000 <br /> Work Order Total $344,500 <br /> Funds are budgeted and available in the Public Utilities' Water Main Replacement Account No. 6230000- <br /> 470707. <br />
The URL can be used to link to this page
Your browser does not support the video tag.