W A f R E N E fl G Y L S F F <br /> 3 dp RIVERSIDE PUBLIC UTILITIES <br /> Board Memorandum <br /> P U B L I C U T I L I T I E S <br /> BOARD OF PUBLIC UTILITIES DATE: March 4, 2011 <br /> ITEM NO: 3 <br /> SUBJECT: REFURBISHMENT OF FIRST STREET WELL-WORK ORDER NO. 1107625 <br /> ISSUE: <br /> That the Board of Public Utilities consider approval of the capital expenditure of$70,000 for Work Order No. <br /> 1107625. <br /> RECOMMENDATION: <br /> That the Board of Public Utilities approve the expenditure of $70,000 for Work Order No. 1107625 to <br /> refurbish First Street Well. <br /> BACKGROUND: <br /> The First Street Well supplies irrigation water to the Riverside Canal and is used for the Gage Exchange, as <br /> well as for non-potable water deliveries to Western Municipal Water District (WMWD). The existing pump <br /> and motor were originally installed in the First Street Well in 1969 after they had been removed from the <br /> Eleventh Street Well. Over the years, the water level in the well has steadily lowered, resulting in reduced <br /> production and lowered efficiency. <br /> The City hired South West Pump and Drill, Inc., (Purchase Order No. 37968)to lower the pump and column <br /> by adding more column piping to the original pump column. However,the condition of the column and pump <br /> revealed it had reached the end of its useful life and the addition of pump column was no longer cost effective <br /> solution. <br /> This project includes the installation of a new pump, pump column and motor in the well. In accord with the <br /> City's competitive bidding requirements, Staff solicited informal bids from four contractors to procure the <br /> materials and complete the replacement of the pump and pump column. Four bids were received on <br /> February 3,2011. Staff has reviewed all provided documentation and determined that Best Drilling and Pump, <br /> Inc. is the lowest responsive, responsible bidder with a bid of$42,662. <br /> The Well pump bids received are summarized in the table below. <br /> Company Bid Total <br /> Best Drilling and Pump, Inc., Bloomington, CA $42,662.00 <br /> Southwest Pump and Drilling, Coachella Valley, CA $45,769.00 <br /> Tri County Pump Company, San Bernardino, CA $51,194.08 <br /> Layne Christensen, Fontana, CA $56,666.59 <br /> â– Engineer's Cost Estimate:$70,000.00 <br /> In addition, staff will purchase materials and use City forces to reconfigure the well discharge piping and <br /> valves. <br />