Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2011 BPU
>
02-04-11
>
02-04-11 BPU RPT 15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2015 10:45:27 AM
Creation date
10/1/2015 10:39:06 AM
Metadata
Fields
Template:
General
Department
Public Utilities
General - Type
Misc
Document Relationships
02-04-2011 BPU AGENDA REVISED
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2011 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
W A I = Ii. E 9 E P. G Y I I F F <br /> -- RIVERSIDE PUBLIC UTILITIES <br /> P U B L I C U T I L I T I E S <br /> Board Memorandum <br /> BOARD OF PUBLIC UTILITIES DATE: February 4,2011 <br /> DIRECTOR'S REPORT <br /> ITEM NO: 15 <br /> SUBJECT: MONTHLY POWER SUPPLY REPORT— December 2010 <br /> POWER USAGE <br /> Total load requirements during December 2010 were 181,225 MWh, of which 169,911 MWh were provided by our <br /> resources and 11,314 MWh from purchases from the CAISO. The purchases from the CAISO were due the system <br /> constraints from the IPP resource. The retail customer load for December 2010 (158,810 MWh) was 1.2% higher than <br /> the retail customer load in December 2009 (156,913 MWh). The actual peak system demand was 294 MW, compared to <br /> actual peak system demand of 296 MW last year. Energy returns were 18,787 MWh and 3,627 MWh were attributed to <br /> losses (3.63%). Green power supplied approximately 22.5% of our retail energy requirements. <br /> The City's generation resources were available during the month as follows: <br /> UNIT OPERATION <br /> IPP: IPP units 1 and 2 operated at 69% capacity factor for the month. <br /> PVNGS: Palo Verde units 1, 2 and 3 operated at 100% capacity factor for the month. <br /> SONGS: SONGS unit 2 & 3 operated at 100% and 0% capacity factor respectively for the month. <br /> Hoover: 100%of RVSD's entitlement was met for the month. <br /> Clearwater: Clearwater's availability was 33%for the month. <br /> RERC: RERC Units 1 &2 availability was 99% for the month. <br /> Springs: Springs units 1, 2, 3 and 4 availability was 95% for the month. <br /> Salton Sea: The Salton Sea units operated at 98% capacity factor for the month. <br /> TRANSMISSION: <br /> Pacific DC: The South to North transmission line is currently derated to 975 MW(No ETR at this time)and the North <br /> to South transmission line is operational at 2,990 MW. <br /> Attached are the charts of daily peaks and the graphical comparison of demand and energy supplied from each resource <br /> for the months of December 2009 and December 2010. <br /> AA <br /> Attachments <br /> cc: Bradley J. Hudson, City Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.