Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2012 BPU
>
11-16-12
>
11-16-12 BPU RPT 04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2015 10:13:08 AM
Creation date
9/30/2015 10:13:03 AM
Metadata
Fields
Template:
General
Department
Public Utilities
General - Type
Misc
Document Relationships
11-16-2012 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2012 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
W A T E R E N E R G Y <br /> RIVERSIDE PUBLIC UTILITIES <br /> Board Memorandum <br /> PUBLIC UTILITIES <br /> BOARD OF PUBLIC UTILITIES DATE: November 16, 2012 <br /> ITEM NO: 4 <br /> SUBJECT: CIRCUIT 1551 SWITCH REPLACEMENT PROJECT -WORK ORDER NO. 1222097 <br /> ISSUE: <br /> Board of Public Utilities approval is requested for Work Order No. 1222097. <br /> RECOMMENDATION: <br /> That the Board of Public Utilities approve the estimated capital expenditure of$187,000 for Work Order No. <br /> 1222097 to install a switch,conduits and other substructures on Circuit 1551 along Mission Grove Parkway to <br /> replace inoperable equipment necessary for circuit load transfers. <br /> BACKGROUND: <br /> During routine maintenance, a gas switch inside Vault 4420 was determined inoperable. Moreover,due to its <br /> location,the Vault routinely fills up with water(runoff from irrigation and rainfall) requiring the need to pump <br /> the structure each time the Vault is accessed. When functional, the Circuit 1551 switch allows for load <br /> transfers with Circuit 1549. <br /> The proposed project involves the installation of 2,155 feet of conduit,3,391 feet of underground cable,one <br /> padmounted switch with enclosure (PSE), one padmounted junction cabinet (PJC), one padmounted <br /> transformer, and 505 feet of secondary cable and conduit. The relocated structures were designed with <br /> consideration given to the surrounding aesthetics. <br /> Engineering was performed by Riverside Public Utilities(RPU)staff and electrical work will be performed by <br /> RPU field forces. Civil construction will be performed by contract crews from the RPU Contractors' Panel. <br /> FISCAL IMPACT: <br /> The capital expenditure for Work Order No. 1222097 is estimated to be$187,000 and is as follows: <br /> of <br /> Total <br /> Design, Construction Management, Inspection $18,400 10% <br /> Construction Contract- Conduits &Substructures $101,000 54% <br /> Contingency $10,100 5% <br /> Construction RPU Field Forces $57,500 31% <br /> Total $187,000 100°I° <br /> Sufficient funds are available in the Electric Capital Account No. 6130000-470603. <br />
The URL can be used to link to this page
Your browser does not support the video tag.