W A t F R E N E R G Y i. [ F } <br /> RIVERSIDE PUBLIC UTILITIES <br /> P U B L I E U T I L I T I E S Board Memorandum <br /> BOARD OF PUBLIC UTILITIES DATE: November 16, 2012 <br /> ITEM NO: 3 <br /> SUBJECT: DETAILED OVERHEAD INSPECTIONS—AREA 2—WORK ORDER NO. 1309936 <br /> ISSUE: <br /> That the Board of Public Utilities consider approval of Work Order No. 1309936. <br /> RECOMMENDATION: <br /> That the Board of Public Utilities approve the estimated operation and maintenance expenditure of$575,000 <br /> for Work Order No. 1309936 for the detailed overhead inspection of approximately 4,526 poles, 107 miles of <br /> overhead wires and conductors, and 1,521 pieces of overhead equipment located in Area 2. <br /> BACKGROUND: <br /> The State of California Public Utilities Code requires the California Public Utilities Commission (CPUC) to <br /> adopt standards for the inspection,maintenance, repair and replacement of electric utility distribution facilities. <br /> Effective March 31, 1997,the CPUC adopted General Order No. 165 (GO 165) for investor owned utilities, <br /> which established minimum inspection requirements for electric distribution facilities, including maximum <br /> allowable inspection cycle lengths, condition rating,record keeping,reporting on scheduling and performance <br /> of corrective action. In March 1998, the CPUC ordered that all publicly owned utilities("POUs")were also to <br /> comply with the requirements of GO 165. Although RPU disputes the CPUC's jurisd iction over and ability to <br /> control the manner in which RPU operates and maintains its system,the standard set by GO 165 is generally <br /> accepted as the industry standard of care for operation and maintenance of utility lines and structures in <br /> California. Accordingly, RPU voluntarily complies with the standards set forth in GO 165. <br /> GO 165 requires that all overhead facilities have a detailed inspection on a not-to-exceed five-year cycle in <br /> order to assess their condition and to identify any deficiencies that are in need of repair. Detailed inspections <br /> of overhead facilities in Area 2(Attachment 1)are currently being scheduled and include approximately 20% <br /> of the entire overhead system. During this inspection, additional data collection will include items such as <br /> capturing heights of attachment and facility information for third party communication utilities, capturing <br /> nameplate data and attaching bar code inventory tags to overhead equipment such as switches, capacitors, <br /> regulators and transformers. This will provide an additional level of Asset Management that will improve <br /> efficiencies and reliability. <br /> FISCAL IMPACT: <br /> The operations and maintenance expenditure for the project is estimated to be $575,000 as follows: <br /> Estimate Percent of Total <br /> Contract Inspection by Contractors' Panel $500,000 86.96010 <br /> Contract Administration, Data Validation and Integration into the Asset <br /> Management System by Utilities and Information Technology Staff $ 55,000 9.57% <br /> Contingency $ 20,000 3.47°10 <br /> Total $575,000 900.08°10 <br />